{"id":78094,"date":"2026-04-29T09:59:58","date_gmt":"2026-04-29T14:59:58","guid":{"rendered":"https:\/\/drillingcontractor.org\/?p=78094"},"modified":"2026-04-29T09:59:58","modified_gmt":"2026-04-29T14:59:58","slug":"petro-victory-energy-reports-stacked-gas-pay-at-sao-joao-well-in-brazil","status":"publish","type":"post","link":"https:\/\/drillingcontractor.org\/petro-victory-energy-reports-stacked-gas-pay-at-sao-joao-well-in-brazil-78094","title":{"rendered":"Petro Victory Energy reports stacked gas pay at S\u00e3o Jo\u00e3o well in Brazil"},"content":{"rendered":"<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">Petro Victory Energy drilled the SJ-12 well in the S&atilde;o Jo&atilde;o field in the Barreirinhas Basin, Brazil, encountering 72 net meters of gas pay across five zones.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">The 7-SJ-12DA-MA well reached a total depth of 3,180 m, intersecting the Barro Duro&ndash;Tutoia and Bom Gosto&ndash;Arpoador formations. Petrophysical interpretation identified five net pay zones in the Bom Gosto&ndash;Arpoador formation, reflecting a stacked gas reservoir system with 125 m of net reservoir and 72 m of net hydrocarbon pay across a gross interval of 280 m. An additional 45 m of oil shows were identified in the shallower Barro Duro&ndash;Tutoia and Bom Gosto&ndash;Arpoador formations.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">A comprehensive open-hole wireline evaluation program was completed, including resistivity, density, neutron and sonic logs, RDT formation testing and sidewall cores. Twenty-one formation pre-tests confirmed pressure continuity, and gas samples were recovered at measured depths of 2,682 m and 2,975 m.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">The well was drilled using a rack-and-pinion hydraulic drilling unit. Following logging operations, 4&frac12;-in. production casing was run and cemented, and the rig was released. A well testing campaign is planned, with results to be announced separately.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Petro Victory Energy drilled the SJ-12 well in the S&atilde;o Jo&atilde;o field in the Barreirinhas Basin, Brazil, encountering 72 net meters of gas pay across five zones. The 7-SJ-12DA-MA well reached a total depth of 3,180 m, intersecting the Barro Duro&ndash;Tutoia and Bom Gosto&ndash;Arpoador formations. Petrophysical interpretation identified five net pay zones in the Bom &hellip;<\/p>\n","protected":false},"author":28,"featured_media":78095,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[13,12],"tags":[],"class_list":["post-78094","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mkt","category-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.1.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Petro Victory Energy reports stacked gas pay at S\u00e3o Jo\u00e3o well in Brazil - Drilling Contractor<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/drillingcontractor.org\/petro-victory-energy-reports-stacked-gas-pay-at-sao-joao-well-in-brazil-78094\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Petro Victory Energy reports stacked gas pay at S\u00e3o Jo\u00e3o well in Brazil - Drilling Contractor\" \/>\n<meta property=\"og:description\" content=\"Petro Victory Energy drilled the SJ-12 well in the S&atilde;o Jo&atilde;o field in the Barreirinhas Basin, Brazil, encountering 72 net meters of gas pay across five zones. The 7-SJ-12DA-MA well reached a total depth of 3,180 m, intersecting the Barro Duro&ndash;Tutoia and Bom Gosto&ndash;Arpoador formations. Petrophysical interpretation identified five net pay zones in the Bom &hellip;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/drillingcontractor.org\/petro-victory-energy-reports-stacked-gas-pay-at-sao-joao-well-in-brazil-78094\" \/>\n<meta property=\"og:site_name\" content=\"Drilling Contractor\" \/>\n<meta property=\"article:publisher\" content=\"http:\/\/www.facebook.com\/pages\/Drilling-Contractor-Magazine\/112140675010\" \/>\n<meta property=\"article:published_time\" content=\"2026-04-29T14:59:58+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2026\/04\/slide2-2000x1020-1-e1777474776271.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1497\" \/>\n\t<meta property=\"og:image:height\" content=\"1020\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Editorial Assistant\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@DC_Magazine\" \/>\n<meta name=\"twitter:site\" content=\"@DC_Magazine\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Editorial Assistant\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/drillingcontractor.org\/petro-victory-energy-reports-stacked-gas-pay-at-sao-joao-well-in-brazil-78094#article\",\"isPartOf\":{\"@id\":\"https:\/\/drillingcontractor.org\/petro-victory-energy-reports-stacked-gas-pay-at-sao-joao-well-in-brazil-78094\"},\"author\":{\"name\":\"Editorial Assistant\",\"@id\":\"https:\/\/drillingcontractor.org\/#\/schema\/person\/a76238a4635eac72dfda8896f704e759\"},\"headline\":\"Petro Victory Energy reports stacked gas pay at S\u00e3o Jo\u00e3o well in Brazil\",\"datePublished\":\"2026-04-29T14:59:58+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/drillingcontractor.org\/petro-victory-energy-reports-stacked-gas-pay-at-sao-joao-well-in-brazil-78094\"},\"wordCount\":194,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/drillingcontractor.org\/#organization\"},\"image\":{\"@id\":\"https:\/\/drillingcontractor.org\/petro-victory-energy-reports-stacked-gas-pay-at-sao-joao-well-in-brazil-78094#primaryimage\"},\"thumbnailUrl\":\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2026\/04\/slide2-2000x1020-1-e1777474776271.jpg\",\"articleSection\":[\"Global and Regional Markets\",\"News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/drillingcontractor.org\/petro-victory-energy-reports-stacked-gas-pay-at-sao-joao-well-in-brazil-78094#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/drillingcontractor.org\/petro-victory-energy-reports-stacked-gas-pay-at-sao-joao-well-in-brazil-78094\",\"url\":\"https:\/\/drillingcontractor.org\/petro-victory-energy-reports-stacked-gas-pay-at-sao-joao-well-in-brazil-78094\",\"name\":\"Petro Victory Energy reports stacked gas pay at S\u00e3o Jo\u00e3o well in Brazil - Drilling Contractor\",\"isPartOf\":{\"@id\":\"https:\/\/drillingcontractor.org\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/drillingcontractor.org\/petro-victory-energy-reports-stacked-gas-pay-at-sao-joao-well-in-brazil-78094#primaryimage\"},\"image\":{\"@id\":\"https:\/\/drillingcontractor.org\/petro-victory-energy-reports-stacked-gas-pay-at-sao-joao-well-in-brazil-78094#primaryimage\"},\"thumbnailUrl\":\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2026\/04\/slide2-2000x1020-1-e1777474776271.jpg\",\"datePublished\":\"2026-04-29T14:59:58+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/drillingcontractor.org\/petro-victory-energy-reports-stacked-gas-pay-at-sao-joao-well-in-brazil-78094#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/drillingcontractor.org\/petro-victory-energy-reports-stacked-gas-pay-at-sao-joao-well-in-brazil-78094\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/drillingcontractor.org\/petro-victory-energy-reports-stacked-gas-pay-at-sao-joao-well-in-brazil-78094#primaryimage\",\"url\":\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2026\/04\/slide2-2000x1020-1-e1777474776271.jpg\",\"contentUrl\":\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2026\/04\/slide2-2000x1020-1-e1777474776271.jpg\",\"width\":1497,\"height\":1020,\"caption\":\"Petro Victory Energy reports stacked gas pay at S\u00e3o Jo\u00e3o well in Brazil\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/drillingcontractor.org\/petro-victory-energy-reports-stacked-gas-pay-at-sao-joao-well-in-brazil-78094#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/drillingcontractor.org\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Petro Victory Energy reports stacked gas pay at S\u00e3o Jo\u00e3o well in Brazil\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/drillingcontractor.org\/#website\",\"url\":\"https:\/\/drillingcontractor.org\/\",\"name\":\"Drilling Contractor\",\"description\":\"Get the latest oil drilling news with DrillingContractor.org\",\"publisher\":{\"@id\":\"https:\/\/drillingcontractor.org\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/drillingcontractor.org\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/drillingcontractor.org\/#organization\",\"name\":\"Drilling Contractor Magazine\",\"url\":\"https:\/\/drillingcontractor.org\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/drillingcontractor.org\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2015\/04\/logo-login2.jpg\",\"contentUrl\":\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2015\/04\/logo-login2.jpg\",\"width\":200,\"height\":68,\"caption\":\"Drilling Contractor Magazine\"},\"image\":{\"@id\":\"https:\/\/drillingcontractor.org\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"http:\/\/www.facebook.com\/pages\/Drilling-Contractor-Magazine\/112140675010\",\"https:\/\/x.com\/DC_Magazine\",\"https:\/\/www.linkedin.com\/grp\/home?gid=1810343\",\"https:\/\/www.youtube.com\/channel\/UC0xXkxpL1WTf99-oLW8Z9hg\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/drillingcontractor.org\/#\/schema\/person\/a76238a4635eac72dfda8896f704e759\",\"name\":\"Editorial Assistant\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/drillingcontractor.org\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/d60e10176c40a683c69d5c0ff15b24753760d27f1439a04df73c97f308d253f3?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/d60e10176c40a683c69d5c0ff15b24753760d27f1439a04df73c97f308d253f3?s=96&d=mm&r=g\",\"caption\":\"Editorial Assistant\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Petro Victory Energy reports stacked gas pay at S\u00e3o Jo\u00e3o well in Brazil - Drilling Contractor","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/drillingcontractor.org\/petro-victory-energy-reports-stacked-gas-pay-at-sao-joao-well-in-brazil-78094","og_locale":"en_US","og_type":"article","og_title":"Petro Victory Energy reports stacked gas pay at S\u00e3o Jo\u00e3o well in Brazil - Drilling Contractor","og_description":"Petro Victory Energy drilled the SJ-12 well in the S&atilde;o Jo&atilde;o field in the Barreirinhas Basin, Brazil, encountering 72 net meters of gas pay across five zones. The 7-SJ-12DA-MA well reached a total depth of 3,180 m, intersecting the Barro Duro&ndash;Tutoia and Bom Gosto&ndash;Arpoador formations. Petrophysical interpretation identified five net pay zones in the Bom &hellip;","og_url":"https:\/\/drillingcontractor.org\/petro-victory-energy-reports-stacked-gas-pay-at-sao-joao-well-in-brazil-78094","og_site_name":"Drilling Contractor","article_publisher":"http:\/\/www.facebook.com\/pages\/Drilling-Contractor-Magazine\/112140675010","article_published_time":"2026-04-29T14:59:58+00:00","og_image":[{"width":1497,"height":1020,"url":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2026\/04\/slide2-2000x1020-1-e1777474776271.jpg","type":"image\/jpeg"}],"author":"Editorial Assistant","twitter_card":"summary_large_image","twitter_creator":"@DC_Magazine","twitter_site":"@DC_Magazine","twitter_misc":{"Written by":"Editorial Assistant","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/drillingcontractor.org\/petro-victory-energy-reports-stacked-gas-pay-at-sao-joao-well-in-brazil-78094#article","isPartOf":{"@id":"https:\/\/drillingcontractor.org\/petro-victory-energy-reports-stacked-gas-pay-at-sao-joao-well-in-brazil-78094"},"author":{"name":"Editorial Assistant","@id":"https:\/\/drillingcontractor.org\/#\/schema\/person\/a76238a4635eac72dfda8896f704e759"},"headline":"Petro Victory Energy reports stacked gas pay at S\u00e3o Jo\u00e3o well in Brazil","datePublished":"2026-04-29T14:59:58+00:00","mainEntityOfPage":{"@id":"https:\/\/drillingcontractor.org\/petro-victory-energy-reports-stacked-gas-pay-at-sao-joao-well-in-brazil-78094"},"wordCount":194,"commentCount":0,"publisher":{"@id":"https:\/\/drillingcontractor.org\/#organization"},"image":{"@id":"https:\/\/drillingcontractor.org\/petro-victory-energy-reports-stacked-gas-pay-at-sao-joao-well-in-brazil-78094#primaryimage"},"thumbnailUrl":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2026\/04\/slide2-2000x1020-1-e1777474776271.jpg","articleSection":["Global and Regional Markets","News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/drillingcontractor.org\/petro-victory-energy-reports-stacked-gas-pay-at-sao-joao-well-in-brazil-78094#respond"]}]},{"@type":"WebPage","@id":"https:\/\/drillingcontractor.org\/petro-victory-energy-reports-stacked-gas-pay-at-sao-joao-well-in-brazil-78094","url":"https:\/\/drillingcontractor.org\/petro-victory-energy-reports-stacked-gas-pay-at-sao-joao-well-in-brazil-78094","name":"Petro Victory Energy reports stacked gas pay at S\u00e3o Jo\u00e3o well in Brazil - Drilling Contractor","isPartOf":{"@id":"https:\/\/drillingcontractor.org\/#website"},"primaryImageOfPage":{"@id":"https:\/\/drillingcontractor.org\/petro-victory-energy-reports-stacked-gas-pay-at-sao-joao-well-in-brazil-78094#primaryimage"},"image":{"@id":"https:\/\/drillingcontractor.org\/petro-victory-energy-reports-stacked-gas-pay-at-sao-joao-well-in-brazil-78094#primaryimage"},"thumbnailUrl":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2026\/04\/slide2-2000x1020-1-e1777474776271.jpg","datePublished":"2026-04-29T14:59:58+00:00","breadcrumb":{"@id":"https:\/\/drillingcontractor.org\/petro-victory-energy-reports-stacked-gas-pay-at-sao-joao-well-in-brazil-78094#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/drillingcontractor.org\/petro-victory-energy-reports-stacked-gas-pay-at-sao-joao-well-in-brazil-78094"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/drillingcontractor.org\/petro-victory-energy-reports-stacked-gas-pay-at-sao-joao-well-in-brazil-78094#primaryimage","url":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2026\/04\/slide2-2000x1020-1-e1777474776271.jpg","contentUrl":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2026\/04\/slide2-2000x1020-1-e1777474776271.jpg","width":1497,"height":1020,"caption":"Petro Victory Energy reports stacked gas pay at S\u00e3o Jo\u00e3o well in Brazil"},{"@type":"BreadcrumbList","@id":"https:\/\/drillingcontractor.org\/petro-victory-energy-reports-stacked-gas-pay-at-sao-joao-well-in-brazil-78094#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/drillingcontractor.org\/"},{"@type":"ListItem","position":2,"name":"Petro Victory Energy reports stacked gas pay at S\u00e3o Jo\u00e3o well in Brazil"}]},{"@type":"WebSite","@id":"https:\/\/drillingcontractor.org\/#website","url":"https:\/\/drillingcontractor.org\/","name":"Drilling Contractor","description":"Get the latest oil drilling news with DrillingContractor.org","publisher":{"@id":"https:\/\/drillingcontractor.org\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/drillingcontractor.org\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/drillingcontractor.org\/#organization","name":"Drilling Contractor Magazine","url":"https:\/\/drillingcontractor.org\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/drillingcontractor.org\/#\/schema\/logo\/image\/","url":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2015\/04\/logo-login2.jpg","contentUrl":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2015\/04\/logo-login2.jpg","width":200,"height":68,"caption":"Drilling Contractor Magazine"},"image":{"@id":"https:\/\/drillingcontractor.org\/#\/schema\/logo\/image\/"},"sameAs":["http:\/\/www.facebook.com\/pages\/Drilling-Contractor-Magazine\/112140675010","https:\/\/x.com\/DC_Magazine","https:\/\/www.linkedin.com\/grp\/home?gid=1810343","https:\/\/www.youtube.com\/channel\/UC0xXkxpL1WTf99-oLW8Z9hg"]},{"@type":"Person","@id":"https:\/\/drillingcontractor.org\/#\/schema\/person\/a76238a4635eac72dfda8896f704e759","name":"Editorial Assistant","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/drillingcontractor.org\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/d60e10176c40a683c69d5c0ff15b24753760d27f1439a04df73c97f308d253f3?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d60e10176c40a683c69d5c0ff15b24753760d27f1439a04df73c97f308d253f3?s=96&d=mm&r=g","caption":"Editorial Assistant"}}]}},"jetpack_featured_media_url":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2026\/04\/slide2-2000x1020-1-e1777474776271.jpg","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/posts\/78094","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/users\/28"}],"replies":[{"embeddable":true,"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/comments?post=78094"}],"version-history":[{"count":1,"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/posts\/78094\/revisions"}],"predecessor-version":[{"id":78096,"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/posts\/78094\/revisions\/78096"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/media\/78095"}],"wp:attachment":[{"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/media?parent=78094"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/categories?post=78094"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/tags?post=78094"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}