{"id":78070,"date":"2026-04-27T09:04:53","date_gmt":"2026-04-27T14:04:53","guid":{"rendered":"https:\/\/drillingcontractor.org\/?p=78070"},"modified":"2026-04-27T09:04:53","modified_gmt":"2026-04-27T14:04:53","slug":"vallourec-signs-five-year-tubular-supply-deal-with-geothermal-developer-fervo-energy","status":"publish","type":"post","link":"https:\/\/drillingcontractor.org\/vallourec-signs-five-year-tubular-supply-deal-with-geothermal-developer-fervo-energy-78070","title":{"rendered":"Vallourec signs five-year tubular supply deal with geothermal developer Fervo Energy"},"content":{"rendered":"<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">Vallourec signed a five-year supply agreement with next-generation geothermal developer Fervo Energy to support the scaled deployment of geothermal energy across the United States in a deal that draws directly on drilling technology developed for shale applications.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">Under the agreement, Vallourec will serve as Fervo&#8217;s exclusive supplier of US-manufactured tubular solutions and VAM connections, delivered through distribution partner Sooner Inc, establishing a fully domestic supply chain for geothermal well infrastructure.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">The collaboration leverages Vallourec&#8217;s VAM high-torque semi-flush connections, originally developed for shale drilling and now qualified for the high-temperature conditions of geothermal wells. The agreement supports Fervo&#8217;s strategy to deploy repeatable GeoBlocks (standardized 50 MW geothermal power generation units) by securing long-term access to domestically produced drilling and completion components, reducing supply chain risk and improving project execution timelines.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">Fervo and Vallourec&#8217;s technical teams will collaborate on field-based expertise, risk mitigation and engineering support, backed by Vallourec&#8217;s R&amp;D center in Houston.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Vallourec signed a five-year supply agreement with next-generation geothermal developer Fervo Energy to support the scaled deployment of geothermal energy across the United States in a deal that draws directly on drilling technology developed for shale applications. Under the agreement, Vallourec will serve as Fervo&#8217;s exclusive supplier of US-manufactured tubular solutions and VAM connections, delivered &hellip;<\/p>\n","protected":false},"author":28,"featured_media":78072,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[12,54],"tags":[],"class_list":["post-78070","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-land"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.1.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Vallourec signs five-year tubular supply deal with geothermal developer Fervo Energy - Drilling Contractor<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/drillingcontractor.org\/vallourec-signs-five-year-tubular-supply-deal-with-geothermal-developer-fervo-energy-78070\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Vallourec signs five-year tubular supply deal with geothermal developer Fervo Energy - Drilling Contractor\" \/>\n<meta property=\"og:description\" content=\"Vallourec signed a five-year supply agreement with next-generation geothermal developer Fervo Energy to support the scaled deployment of geothermal energy across the United States in a deal that draws directly on drilling technology developed for shale applications. Under the agreement, Vallourec will serve as Fervo&#8217;s exclusive supplier of US-manufactured tubular solutions and VAM connections, delivered &hellip;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/drillingcontractor.org\/vallourec-signs-five-year-tubular-supply-deal-with-geothermal-developer-fervo-energy-78070\" \/>\n<meta property=\"og:site_name\" content=\"Drilling Contractor\" \/>\n<meta property=\"article:publisher\" content=\"http:\/\/www.facebook.com\/pages\/Drilling-Contractor-Magazine\/112140675010\" \/>\n<meta property=\"article:published_time\" content=\"2026-04-27T14:04:53+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2026\/04\/Screenshot-2026-04-27-at-16-03-42-Vallourec-Smart-Tubular-Solutions.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"1184\" \/>\n\t<meta property=\"og:image:height\" content=\"696\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Editorial Assistant\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@DC_Magazine\" \/>\n<meta name=\"twitter:site\" content=\"@DC_Magazine\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Editorial Assistant\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/drillingcontractor.org\/vallourec-signs-five-year-tubular-supply-deal-with-geothermal-developer-fervo-energy-78070#article\",\"isPartOf\":{\"@id\":\"https:\/\/drillingcontractor.org\/vallourec-signs-five-year-tubular-supply-deal-with-geothermal-developer-fervo-energy-78070\"},\"author\":{\"name\":\"Editorial Assistant\",\"@id\":\"https:\/\/drillingcontractor.org\/#\/schema\/person\/a76238a4635eac72dfda8896f704e759\"},\"headline\":\"Vallourec signs five-year tubular supply deal with geothermal developer Fervo Energy\",\"datePublished\":\"2026-04-27T14:04:53+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/drillingcontractor.org\/vallourec-signs-five-year-tubular-supply-deal-with-geothermal-developer-fervo-energy-78070\"},\"wordCount\":163,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/drillingcontractor.org\/#organization\"},\"image\":{\"@id\":\"https:\/\/drillingcontractor.org\/vallourec-signs-five-year-tubular-supply-deal-with-geothermal-developer-fervo-energy-78070#primaryimage\"},\"thumbnailUrl\":\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2026\/04\/Screenshot-2026-04-27-at-16-03-42-Vallourec-Smart-Tubular-Solutions.jpeg\",\"articleSection\":[\"News\",\"Onshore Advances\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/drillingcontractor.org\/vallourec-signs-five-year-tubular-supply-deal-with-geothermal-developer-fervo-energy-78070#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/drillingcontractor.org\/vallourec-signs-five-year-tubular-supply-deal-with-geothermal-developer-fervo-energy-78070\",\"url\":\"https:\/\/drillingcontractor.org\/vallourec-signs-five-year-tubular-supply-deal-with-geothermal-developer-fervo-energy-78070\",\"name\":\"Vallourec signs five-year tubular supply deal with geothermal developer Fervo Energy - Drilling Contractor\",\"isPartOf\":{\"@id\":\"https:\/\/drillingcontractor.org\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/drillingcontractor.org\/vallourec-signs-five-year-tubular-supply-deal-with-geothermal-developer-fervo-energy-78070#primaryimage\"},\"image\":{\"@id\":\"https:\/\/drillingcontractor.org\/vallourec-signs-five-year-tubular-supply-deal-with-geothermal-developer-fervo-energy-78070#primaryimage\"},\"thumbnailUrl\":\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2026\/04\/Screenshot-2026-04-27-at-16-03-42-Vallourec-Smart-Tubular-Solutions.jpeg\",\"datePublished\":\"2026-04-27T14:04:53+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/drillingcontractor.org\/vallourec-signs-five-year-tubular-supply-deal-with-geothermal-developer-fervo-energy-78070#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/drillingcontractor.org\/vallourec-signs-five-year-tubular-supply-deal-with-geothermal-developer-fervo-energy-78070\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/drillingcontractor.org\/vallourec-signs-five-year-tubular-supply-deal-with-geothermal-developer-fervo-energy-78070#primaryimage\",\"url\":\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2026\/04\/Screenshot-2026-04-27-at-16-03-42-Vallourec-Smart-Tubular-Solutions.jpeg\",\"contentUrl\":\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2026\/04\/Screenshot-2026-04-27-at-16-03-42-Vallourec-Smart-Tubular-Solutions.jpeg\",\"width\":1184,\"height\":696,\"caption\":\"Vallourec signs five-year tubular supply deal with geothermal developer Fervo Energy\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/drillingcontractor.org\/vallourec-signs-five-year-tubular-supply-deal-with-geothermal-developer-fervo-energy-78070#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/drillingcontractor.org\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Vallourec signs five-year tubular supply deal with geothermal developer Fervo Energy\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/drillingcontractor.org\/#website\",\"url\":\"https:\/\/drillingcontractor.org\/\",\"name\":\"Drilling Contractor\",\"description\":\"Get the latest oil drilling news with DrillingContractor.org\",\"publisher\":{\"@id\":\"https:\/\/drillingcontractor.org\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/drillingcontractor.org\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/drillingcontractor.org\/#organization\",\"name\":\"Drilling Contractor Magazine\",\"url\":\"https:\/\/drillingcontractor.org\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/drillingcontractor.org\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2015\/04\/logo-login2.jpg\",\"contentUrl\":\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2015\/04\/logo-login2.jpg\",\"width\":200,\"height\":68,\"caption\":\"Drilling Contractor Magazine\"},\"image\":{\"@id\":\"https:\/\/drillingcontractor.org\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"http:\/\/www.facebook.com\/pages\/Drilling-Contractor-Magazine\/112140675010\",\"https:\/\/x.com\/DC_Magazine\",\"https:\/\/www.linkedin.com\/grp\/home?gid=1810343\",\"https:\/\/www.youtube.com\/channel\/UC0xXkxpL1WTf99-oLW8Z9hg\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/drillingcontractor.org\/#\/schema\/person\/a76238a4635eac72dfda8896f704e759\",\"name\":\"Editorial Assistant\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/drillingcontractor.org\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/d60e10176c40a683c69d5c0ff15b24753760d27f1439a04df73c97f308d253f3?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/d60e10176c40a683c69d5c0ff15b24753760d27f1439a04df73c97f308d253f3?s=96&d=mm&r=g\",\"caption\":\"Editorial Assistant\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Vallourec signs five-year tubular supply deal with geothermal developer Fervo Energy - Drilling Contractor","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/drillingcontractor.org\/vallourec-signs-five-year-tubular-supply-deal-with-geothermal-developer-fervo-energy-78070","og_locale":"en_US","og_type":"article","og_title":"Vallourec signs five-year tubular supply deal with geothermal developer Fervo Energy - Drilling Contractor","og_description":"Vallourec signed a five-year supply agreement with next-generation geothermal developer Fervo Energy to support the scaled deployment of geothermal energy across the United States in a deal that draws directly on drilling technology developed for shale applications. Under the agreement, Vallourec will serve as Fervo&#8217;s exclusive supplier of US-manufactured tubular solutions and VAM connections, delivered &hellip;","og_url":"https:\/\/drillingcontractor.org\/vallourec-signs-five-year-tubular-supply-deal-with-geothermal-developer-fervo-energy-78070","og_site_name":"Drilling Contractor","article_publisher":"http:\/\/www.facebook.com\/pages\/Drilling-Contractor-Magazine\/112140675010","article_published_time":"2026-04-27T14:04:53+00:00","og_image":[{"width":1184,"height":696,"url":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2026\/04\/Screenshot-2026-04-27-at-16-03-42-Vallourec-Smart-Tubular-Solutions.jpeg","type":"image\/jpeg"}],"author":"Editorial Assistant","twitter_card":"summary_large_image","twitter_creator":"@DC_Magazine","twitter_site":"@DC_Magazine","twitter_misc":{"Written by":"Editorial Assistant","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/drillingcontractor.org\/vallourec-signs-five-year-tubular-supply-deal-with-geothermal-developer-fervo-energy-78070#article","isPartOf":{"@id":"https:\/\/drillingcontractor.org\/vallourec-signs-five-year-tubular-supply-deal-with-geothermal-developer-fervo-energy-78070"},"author":{"name":"Editorial Assistant","@id":"https:\/\/drillingcontractor.org\/#\/schema\/person\/a76238a4635eac72dfda8896f704e759"},"headline":"Vallourec signs five-year tubular supply deal with geothermal developer Fervo Energy","datePublished":"2026-04-27T14:04:53+00:00","mainEntityOfPage":{"@id":"https:\/\/drillingcontractor.org\/vallourec-signs-five-year-tubular-supply-deal-with-geothermal-developer-fervo-energy-78070"},"wordCount":163,"commentCount":0,"publisher":{"@id":"https:\/\/drillingcontractor.org\/#organization"},"image":{"@id":"https:\/\/drillingcontractor.org\/vallourec-signs-five-year-tubular-supply-deal-with-geothermal-developer-fervo-energy-78070#primaryimage"},"thumbnailUrl":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2026\/04\/Screenshot-2026-04-27-at-16-03-42-Vallourec-Smart-Tubular-Solutions.jpeg","articleSection":["News","Onshore Advances"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/drillingcontractor.org\/vallourec-signs-five-year-tubular-supply-deal-with-geothermal-developer-fervo-energy-78070#respond"]}]},{"@type":"WebPage","@id":"https:\/\/drillingcontractor.org\/vallourec-signs-five-year-tubular-supply-deal-with-geothermal-developer-fervo-energy-78070","url":"https:\/\/drillingcontractor.org\/vallourec-signs-five-year-tubular-supply-deal-with-geothermal-developer-fervo-energy-78070","name":"Vallourec signs five-year tubular supply deal with geothermal developer Fervo Energy - Drilling Contractor","isPartOf":{"@id":"https:\/\/drillingcontractor.org\/#website"},"primaryImageOfPage":{"@id":"https:\/\/drillingcontractor.org\/vallourec-signs-five-year-tubular-supply-deal-with-geothermal-developer-fervo-energy-78070#primaryimage"},"image":{"@id":"https:\/\/drillingcontractor.org\/vallourec-signs-five-year-tubular-supply-deal-with-geothermal-developer-fervo-energy-78070#primaryimage"},"thumbnailUrl":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2026\/04\/Screenshot-2026-04-27-at-16-03-42-Vallourec-Smart-Tubular-Solutions.jpeg","datePublished":"2026-04-27T14:04:53+00:00","breadcrumb":{"@id":"https:\/\/drillingcontractor.org\/vallourec-signs-five-year-tubular-supply-deal-with-geothermal-developer-fervo-energy-78070#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/drillingcontractor.org\/vallourec-signs-five-year-tubular-supply-deal-with-geothermal-developer-fervo-energy-78070"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/drillingcontractor.org\/vallourec-signs-five-year-tubular-supply-deal-with-geothermal-developer-fervo-energy-78070#primaryimage","url":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2026\/04\/Screenshot-2026-04-27-at-16-03-42-Vallourec-Smart-Tubular-Solutions.jpeg","contentUrl":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2026\/04\/Screenshot-2026-04-27-at-16-03-42-Vallourec-Smart-Tubular-Solutions.jpeg","width":1184,"height":696,"caption":"Vallourec signs five-year tubular supply deal with geothermal developer Fervo Energy"},{"@type":"BreadcrumbList","@id":"https:\/\/drillingcontractor.org\/vallourec-signs-five-year-tubular-supply-deal-with-geothermal-developer-fervo-energy-78070#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/drillingcontractor.org\/"},{"@type":"ListItem","position":2,"name":"Vallourec signs five-year tubular supply deal with geothermal developer Fervo Energy"}]},{"@type":"WebSite","@id":"https:\/\/drillingcontractor.org\/#website","url":"https:\/\/drillingcontractor.org\/","name":"Drilling Contractor","description":"Get the latest oil drilling news with DrillingContractor.org","publisher":{"@id":"https:\/\/drillingcontractor.org\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/drillingcontractor.org\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/drillingcontractor.org\/#organization","name":"Drilling Contractor Magazine","url":"https:\/\/drillingcontractor.org\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/drillingcontractor.org\/#\/schema\/logo\/image\/","url":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2015\/04\/logo-login2.jpg","contentUrl":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2015\/04\/logo-login2.jpg","width":200,"height":68,"caption":"Drilling Contractor Magazine"},"image":{"@id":"https:\/\/drillingcontractor.org\/#\/schema\/logo\/image\/"},"sameAs":["http:\/\/www.facebook.com\/pages\/Drilling-Contractor-Magazine\/112140675010","https:\/\/x.com\/DC_Magazine","https:\/\/www.linkedin.com\/grp\/home?gid=1810343","https:\/\/www.youtube.com\/channel\/UC0xXkxpL1WTf99-oLW8Z9hg"]},{"@type":"Person","@id":"https:\/\/drillingcontractor.org\/#\/schema\/person\/a76238a4635eac72dfda8896f704e759","name":"Editorial Assistant","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/drillingcontractor.org\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/d60e10176c40a683c69d5c0ff15b24753760d27f1439a04df73c97f308d253f3?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d60e10176c40a683c69d5c0ff15b24753760d27f1439a04df73c97f308d253f3?s=96&d=mm&r=g","caption":"Editorial Assistant"}}]}},"jetpack_featured_media_url":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2026\/04\/Screenshot-2026-04-27-at-16-03-42-Vallourec-Smart-Tubular-Solutions.jpeg","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/posts\/78070","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/users\/28"}],"replies":[{"embeddable":true,"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/comments?post=78070"}],"version-history":[{"count":1,"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/posts\/78070\/revisions"}],"predecessor-version":[{"id":78073,"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/posts\/78070\/revisions\/78073"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/media\/78072"}],"wp:attachment":[{"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/media?parent=78070"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/categories?post=78070"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/tags?post=78070"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}