{"id":78064,"date":"2026-04-27T08:41:33","date_gmt":"2026-04-27T13:41:33","guid":{"rendered":"https:\/\/drillingcontractor.org\/?p=78064"},"modified":"2026-04-27T08:42:13","modified_gmt":"2026-04-27T13:42:13","slug":"archer-secures-three-year-equinor-wireline-extension-on-norwegian-continental-shelf","status":"publish","type":"post","link":"https:\/\/drillingcontractor.org\/archer-secures-three-year-equinor-wireline-extension-on-norwegian-continental-shelf-78064","title":{"rendered":"Archer secures three-year Equinor wireline extension on Norwegian Continental Shelf"},"content":{"rendered":"<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">Archer was awarded a three-year contract extension by Equinor for the provision of wireline and intervention services on the Norwegian Continental Shelf, building on an integrated wireline contract originally awarded in 2021.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">While the original agreement included optional extension periods of three times two years, the current award represents a firm three-year extension, providing continued operational continuity and visibility. The extension has a total value of approximately NOK 3 billion, with around half attributed to Archer and the remainder allocated to its alliance partners.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">Under the agreement, Archer will continue to deliver integrated wireline and intervention services across key Equinor assets alongside its alliance partners, incorporating cased-hole mechanical wireline services, tractor and powered mechanical services, and electric-line logging services.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Archer was awarded a three-year contract extension by Equinor for the provision of wireline and intervention services on the Norwegian Continental Shelf, building on an integrated wireline contract originally awarded in 2021. While the original agreement included optional extension periods of three times two years, the current award represents a firm three-year extension, providing continued &hellip;<\/p>\n","protected":false},"author":28,"featured_media":76169,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[12,53],"tags":[],"class_list":["post-78064","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-os"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.1.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Archer secures three-year Equinor wireline extension on Norwegian Continental Shelf - Drilling Contractor<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/drillingcontractor.org\/archer-secures-three-year-equinor-wireline-extension-on-norwegian-continental-shelf-78064\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Archer secures three-year Equinor wireline extension on Norwegian Continental Shelf - Drilling Contractor\" \/>\n<meta property=\"og:description\" content=\"Archer was awarded a three-year contract extension by Equinor for the provision of wireline and intervention services on the Norwegian Continental Shelf, building on an integrated wireline contract originally awarded in 2021. While the original agreement included optional extension periods of three times two years, the current award represents a firm three-year extension, providing continued &hellip;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/drillingcontractor.org\/archer-secures-three-year-equinor-wireline-extension-on-norwegian-continental-shelf-78064\" \/>\n<meta property=\"og:site_name\" content=\"Drilling Contractor\" \/>\n<meta property=\"article:publisher\" content=\"http:\/\/www.facebook.com\/pages\/Drilling-Contractor-Magazine\/112140675010\" \/>\n<meta property=\"article:published_time\" content=\"2026-04-27T13:41:33+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-27T13:42:13+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2025\/12\/hd_default.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1300\" \/>\n\t<meta property=\"og:image:height\" content=\"866\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Editorial Assistant\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@DC_Magazine\" \/>\n<meta name=\"twitter:site\" content=\"@DC_Magazine\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Editorial Assistant\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/drillingcontractor.org\/archer-secures-three-year-equinor-wireline-extension-on-norwegian-continental-shelf-78064#article\",\"isPartOf\":{\"@id\":\"https:\/\/drillingcontractor.org\/archer-secures-three-year-equinor-wireline-extension-on-norwegian-continental-shelf-78064\"},\"author\":{\"name\":\"Editorial Assistant\",\"@id\":\"https:\/\/drillingcontractor.org\/#\/schema\/person\/a76238a4635eac72dfda8896f704e759\"},\"headline\":\"Archer secures three-year Equinor wireline extension on Norwegian Continental Shelf\",\"datePublished\":\"2026-04-27T13:41:33+00:00\",\"dateModified\":\"2026-04-27T13:42:13+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/drillingcontractor.org\/archer-secures-three-year-equinor-wireline-extension-on-norwegian-continental-shelf-78064\"},\"wordCount\":127,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/drillingcontractor.org\/#organization\"},\"image\":{\"@id\":\"https:\/\/drillingcontractor.org\/archer-secures-three-year-equinor-wireline-extension-on-norwegian-continental-shelf-78064#primaryimage\"},\"thumbnailUrl\":\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2025\/12\/hd_default.jpg\",\"articleSection\":[\"News\",\"The Offshore Frontier\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/drillingcontractor.org\/archer-secures-three-year-equinor-wireline-extension-on-norwegian-continental-shelf-78064#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/drillingcontractor.org\/archer-secures-three-year-equinor-wireline-extension-on-norwegian-continental-shelf-78064\",\"url\":\"https:\/\/drillingcontractor.org\/archer-secures-three-year-equinor-wireline-extension-on-norwegian-continental-shelf-78064\",\"name\":\"Archer secures three-year Equinor wireline extension on Norwegian Continental Shelf - Drilling Contractor\",\"isPartOf\":{\"@id\":\"https:\/\/drillingcontractor.org\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/drillingcontractor.org\/archer-secures-three-year-equinor-wireline-extension-on-norwegian-continental-shelf-78064#primaryimage\"},\"image\":{\"@id\":\"https:\/\/drillingcontractor.org\/archer-secures-three-year-equinor-wireline-extension-on-norwegian-continental-shelf-78064#primaryimage\"},\"thumbnailUrl\":\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2025\/12\/hd_default.jpg\",\"datePublished\":\"2026-04-27T13:41:33+00:00\",\"dateModified\":\"2026-04-27T13:42:13+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/drillingcontractor.org\/archer-secures-three-year-equinor-wireline-extension-on-norwegian-continental-shelf-78064#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/drillingcontractor.org\/archer-secures-three-year-equinor-wireline-extension-on-norwegian-continental-shelf-78064\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/drillingcontractor.org\/archer-secures-three-year-equinor-wireline-extension-on-norwegian-continental-shelf-78064#primaryimage\",\"url\":\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2025\/12\/hd_default.jpg\",\"contentUrl\":\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2025\/12\/hd_default.jpg\",\"width\":1300,\"height\":866,\"caption\":\"Archer wins five-year YPF drilling award in Vaca Muerta\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/drillingcontractor.org\/archer-secures-three-year-equinor-wireline-extension-on-norwegian-continental-shelf-78064#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/drillingcontractor.org\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Archer secures three-year Equinor wireline extension on Norwegian Continental Shelf\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/drillingcontractor.org\/#website\",\"url\":\"https:\/\/drillingcontractor.org\/\",\"name\":\"Drilling Contractor\",\"description\":\"Get the latest oil drilling news with DrillingContractor.org\",\"publisher\":{\"@id\":\"https:\/\/drillingcontractor.org\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/drillingcontractor.org\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/drillingcontractor.org\/#organization\",\"name\":\"Drilling Contractor Magazine\",\"url\":\"https:\/\/drillingcontractor.org\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/drillingcontractor.org\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2015\/04\/logo-login2.jpg\",\"contentUrl\":\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2015\/04\/logo-login2.jpg\",\"width\":200,\"height\":68,\"caption\":\"Drilling Contractor Magazine\"},\"image\":{\"@id\":\"https:\/\/drillingcontractor.org\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"http:\/\/www.facebook.com\/pages\/Drilling-Contractor-Magazine\/112140675010\",\"https:\/\/x.com\/DC_Magazine\",\"https:\/\/www.linkedin.com\/grp\/home?gid=1810343\",\"https:\/\/www.youtube.com\/channel\/UC0xXkxpL1WTf99-oLW8Z9hg\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/drillingcontractor.org\/#\/schema\/person\/a76238a4635eac72dfda8896f704e759\",\"name\":\"Editorial Assistant\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/drillingcontractor.org\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/d60e10176c40a683c69d5c0ff15b24753760d27f1439a04df73c97f308d253f3?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/d60e10176c40a683c69d5c0ff15b24753760d27f1439a04df73c97f308d253f3?s=96&d=mm&r=g\",\"caption\":\"Editorial Assistant\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Archer secures three-year Equinor wireline extension on Norwegian Continental Shelf - Drilling Contractor","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/drillingcontractor.org\/archer-secures-three-year-equinor-wireline-extension-on-norwegian-continental-shelf-78064","og_locale":"en_US","og_type":"article","og_title":"Archer secures three-year Equinor wireline extension on Norwegian Continental Shelf - Drilling Contractor","og_description":"Archer was awarded a three-year contract extension by Equinor for the provision of wireline and intervention services on the Norwegian Continental Shelf, building on an integrated wireline contract originally awarded in 2021. While the original agreement included optional extension periods of three times two years, the current award represents a firm three-year extension, providing continued &hellip;","og_url":"https:\/\/drillingcontractor.org\/archer-secures-three-year-equinor-wireline-extension-on-norwegian-continental-shelf-78064","og_site_name":"Drilling Contractor","article_publisher":"http:\/\/www.facebook.com\/pages\/Drilling-Contractor-Magazine\/112140675010","article_published_time":"2026-04-27T13:41:33+00:00","article_modified_time":"2026-04-27T13:42:13+00:00","og_image":[{"width":1300,"height":866,"url":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2025\/12\/hd_default.jpg","type":"image\/jpeg"}],"author":"Editorial Assistant","twitter_card":"summary_large_image","twitter_creator":"@DC_Magazine","twitter_site":"@DC_Magazine","twitter_misc":{"Written by":"Editorial Assistant","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/drillingcontractor.org\/archer-secures-three-year-equinor-wireline-extension-on-norwegian-continental-shelf-78064#article","isPartOf":{"@id":"https:\/\/drillingcontractor.org\/archer-secures-three-year-equinor-wireline-extension-on-norwegian-continental-shelf-78064"},"author":{"name":"Editorial Assistant","@id":"https:\/\/drillingcontractor.org\/#\/schema\/person\/a76238a4635eac72dfda8896f704e759"},"headline":"Archer secures three-year Equinor wireline extension on Norwegian Continental Shelf","datePublished":"2026-04-27T13:41:33+00:00","dateModified":"2026-04-27T13:42:13+00:00","mainEntityOfPage":{"@id":"https:\/\/drillingcontractor.org\/archer-secures-three-year-equinor-wireline-extension-on-norwegian-continental-shelf-78064"},"wordCount":127,"commentCount":0,"publisher":{"@id":"https:\/\/drillingcontractor.org\/#organization"},"image":{"@id":"https:\/\/drillingcontractor.org\/archer-secures-three-year-equinor-wireline-extension-on-norwegian-continental-shelf-78064#primaryimage"},"thumbnailUrl":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2025\/12\/hd_default.jpg","articleSection":["News","The Offshore Frontier"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/drillingcontractor.org\/archer-secures-three-year-equinor-wireline-extension-on-norwegian-continental-shelf-78064#respond"]}]},{"@type":"WebPage","@id":"https:\/\/drillingcontractor.org\/archer-secures-three-year-equinor-wireline-extension-on-norwegian-continental-shelf-78064","url":"https:\/\/drillingcontractor.org\/archer-secures-three-year-equinor-wireline-extension-on-norwegian-continental-shelf-78064","name":"Archer secures three-year Equinor wireline extension on Norwegian Continental Shelf - Drilling Contractor","isPartOf":{"@id":"https:\/\/drillingcontractor.org\/#website"},"primaryImageOfPage":{"@id":"https:\/\/drillingcontractor.org\/archer-secures-three-year-equinor-wireline-extension-on-norwegian-continental-shelf-78064#primaryimage"},"image":{"@id":"https:\/\/drillingcontractor.org\/archer-secures-three-year-equinor-wireline-extension-on-norwegian-continental-shelf-78064#primaryimage"},"thumbnailUrl":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2025\/12\/hd_default.jpg","datePublished":"2026-04-27T13:41:33+00:00","dateModified":"2026-04-27T13:42:13+00:00","breadcrumb":{"@id":"https:\/\/drillingcontractor.org\/archer-secures-three-year-equinor-wireline-extension-on-norwegian-continental-shelf-78064#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/drillingcontractor.org\/archer-secures-three-year-equinor-wireline-extension-on-norwegian-continental-shelf-78064"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/drillingcontractor.org\/archer-secures-three-year-equinor-wireline-extension-on-norwegian-continental-shelf-78064#primaryimage","url":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2025\/12\/hd_default.jpg","contentUrl":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2025\/12\/hd_default.jpg","width":1300,"height":866,"caption":"Archer wins five-year YPF drilling award in Vaca Muerta"},{"@type":"BreadcrumbList","@id":"https:\/\/drillingcontractor.org\/archer-secures-three-year-equinor-wireline-extension-on-norwegian-continental-shelf-78064#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/drillingcontractor.org\/"},{"@type":"ListItem","position":2,"name":"Archer secures three-year Equinor wireline extension on Norwegian Continental Shelf"}]},{"@type":"WebSite","@id":"https:\/\/drillingcontractor.org\/#website","url":"https:\/\/drillingcontractor.org\/","name":"Drilling Contractor","description":"Get the latest oil drilling news with DrillingContractor.org","publisher":{"@id":"https:\/\/drillingcontractor.org\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/drillingcontractor.org\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/drillingcontractor.org\/#organization","name":"Drilling Contractor Magazine","url":"https:\/\/drillingcontractor.org\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/drillingcontractor.org\/#\/schema\/logo\/image\/","url":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2015\/04\/logo-login2.jpg","contentUrl":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2015\/04\/logo-login2.jpg","width":200,"height":68,"caption":"Drilling Contractor Magazine"},"image":{"@id":"https:\/\/drillingcontractor.org\/#\/schema\/logo\/image\/"},"sameAs":["http:\/\/www.facebook.com\/pages\/Drilling-Contractor-Magazine\/112140675010","https:\/\/x.com\/DC_Magazine","https:\/\/www.linkedin.com\/grp\/home?gid=1810343","https:\/\/www.youtube.com\/channel\/UC0xXkxpL1WTf99-oLW8Z9hg"]},{"@type":"Person","@id":"https:\/\/drillingcontractor.org\/#\/schema\/person\/a76238a4635eac72dfda8896f704e759","name":"Editorial Assistant","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/drillingcontractor.org\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/d60e10176c40a683c69d5c0ff15b24753760d27f1439a04df73c97f308d253f3?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d60e10176c40a683c69d5c0ff15b24753760d27f1439a04df73c97f308d253f3?s=96&d=mm&r=g","caption":"Editorial Assistant"}}]}},"jetpack_featured_media_url":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2025\/12\/hd_default.jpg","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/posts\/78064","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/users\/28"}],"replies":[{"embeddable":true,"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/comments?post=78064"}],"version-history":[{"count":2,"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/posts\/78064\/revisions"}],"predecessor-version":[{"id":78066,"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/posts\/78064\/revisions\/78066"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/media\/76169"}],"wp:attachment":[{"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/media?parent=78064"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/categories?post=78064"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/tags?post=78064"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}