{"id":7310,"date":"2010-10-15T13:41:13","date_gmt":"2010-10-15T18:41:13","guid":{"rendered":"https:\/\/drillingcontractor.org\/?p=7310"},"modified":"2010-10-15T13:41:48","modified_gmt":"2010-10-15T18:41:48","slug":"shell-launches-phase-ii-of-parque-das-conchas-offshore-brazil-project-exceeds-production-targets","status":"publish","type":"post","link":"https:\/\/drillingcontractor.org\/shell-launches-phase-ii-of-parque-das-conchas-offshore-brazil-project-exceeds-production-targets-7310","title":{"rendered":"Shell launches phase II of Parque das Conchas offshore Brazil: Project exceeds production targets"},"content":{"rendered":"<p><strong><a href=\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2010\/10\/shell.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-7312\" title=\"shell\" src=\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2010\/10\/shell-300x180.jpg\" alt=\"\" width=\"300\" height=\"180\" srcset=\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2010\/10\/shell-300x180.jpg 300w, https:\/\/drillingcontractor.org\/wp-content\/uploads\/2010\/10\/shell.jpg 333w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a>Shell<\/strong> announced on 14 October new investment to support phase II of the prolific deepwater Parque das Conchas (BC-10) project, which lies more than 100 kilometres (62 miles) off the coast of Brazil. This significant investment develops the fourth field in the BC-10 block and continues a successful wave of production growth in Shell&rsquo;s Upstream Americas business, the company says. The full project delivers an energy resource of approximately 300 MM boe, with production of some 100,000 boe\/day.<\/p>\n<p>Phase II includes seven additional development wells, which will reach total depths of approximately 1,100 m (3,600 ft) below the seabed. Production from the first phase of Parque das Conchas is currently above expectations, according to Shell. The field lies in water depths of some 2,000 m (6,500 ft).<\/p>\n<p>&ldquo;This is another important milestone in our delivery of substantial growth in the Americas,&#8221; said <strong>Marvin Odum<\/strong>, Upstream Americas Director. &ldquo;Over the next five years, we&rsquo;ll see more projects reach critical delivery points in this region such as last month&#8217;s announcement of our final investment decision for the Mars B project in the Gulf of  Mexico.&rdquo;<\/p>\n<p>Shell began production from the first phase of Parque das Conchas in 2009 with production from nine wells in three fields &ndash; Abalone, Ostra, and Argonauta B-West.<\/p>\n<p>Parque das Conchas was the first full-field development to separate and pump oil and gas from the seabed. Shell&rsquo;s Perdido Development, in the Gulf of Mexico, was the second.<\/p>\n<p>Electric pumps of 1,500 hp drive the oil up nearly 1,800 m (6,000 ft) to the surface for processing on the Espirito Santo, a floating, production, storage, and offloading (FPSO) vessel. The FPSO has a daily processing capacity of about 100,000 bbl of oil and 50 MM cu ft of natural gas.<\/p>\n<p>Shell, operator of Parque das Conchas, holds a 50% interest. Petrobras (35%) and ONGC (15%) hold the remaining interest.<\/p>\n<p>&ldquo;Bringing this phase of Parque das Conchas to life represents another proud moment for Shell&rsquo;s deep-water offshore teams,&rdquo; Mr Odum added. &ldquo;The men and women on these teams exude excellence and are backed by a strong legacy of deepwater expertise. We&rsquo;re all looking forward to continuing our responsible operations in the waters off Brazil.&rdquo;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Shell announced on 14 October new investment to support phase II of the prolific deepwater Parque das Conchas&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[12],"tags":[],"class_list":["post-7310","post","type-post","status-publish","format-standard","hentry","category-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.1.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Shell launches phase II of Parque das Conchas offshore Brazil: Project exceeds production targets - Drilling Contractor<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/drillingcontractor.org\/shell-launches-phase-ii-of-parque-das-conchas-offshore-brazil-project-exceeds-production-targets-7310\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Shell launches phase II of Parque das Conchas offshore Brazil: Project exceeds production targets - Drilling Contractor\" \/>\n<meta property=\"og:description\" content=\"Shell announced on 14 October new investment to support phase II of the prolific deepwater Parque das Conchas...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/drillingcontractor.org\/shell-launches-phase-ii-of-parque-das-conchas-offshore-brazil-project-exceeds-production-targets-7310\" \/>\n<meta property=\"og:site_name\" content=\"Drilling Contractor\" \/>\n<meta property=\"article:publisher\" content=\"http:\/\/www.facebook.com\/pages\/Drilling-Contractor-Magazine\/112140675010\" \/>\n<meta property=\"article:published_time\" content=\"2010-10-15T18:41:13+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2010-10-15T18:41:48+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2010\/10\/shell.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"333\" \/>\n\t<meta property=\"og:image:height\" content=\"200\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Brian Parks\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@DC_Magazine\" \/>\n<meta name=\"twitter:site\" content=\"@DC_Magazine\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Brian Parks\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/drillingcontractor.org\/shell-launches-phase-ii-of-parque-das-conchas-offshore-brazil-project-exceeds-production-targets-7310#article\",\"isPartOf\":{\"@id\":\"https:\/\/drillingcontractor.org\/shell-launches-phase-ii-of-parque-das-conchas-offshore-brazil-project-exceeds-production-targets-7310\"},\"author\":{\"name\":\"Brian Parks\",\"@id\":\"https:\/\/drillingcontractor.org\/#\/schema\/person\/4a6fe020ea30ed5fafc20070dd3c31a8\"},\"headline\":\"Shell launches phase II of Parque das Conchas offshore Brazil: Project exceeds production targets\",\"datePublished\":\"2010-10-15T18:41:13+00:00\",\"dateModified\":\"2010-10-15T18:41:48+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/drillingcontractor.org\/shell-launches-phase-ii-of-parque-das-conchas-offshore-brazil-project-exceeds-production-targets-7310\"},\"wordCount\":365,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/drillingcontractor.org\/#organization\"},\"image\":{\"@id\":\"https:\/\/drillingcontractor.org\/shell-launches-phase-ii-of-parque-das-conchas-offshore-brazil-project-exceeds-production-targets-7310#primaryimage\"},\"thumbnailUrl\":\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2010\/10\/shell-300x180.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/drillingcontractor.org\/shell-launches-phase-ii-of-parque-das-conchas-offshore-brazil-project-exceeds-production-targets-7310#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/drillingcontractor.org\/shell-launches-phase-ii-of-parque-das-conchas-offshore-brazil-project-exceeds-production-targets-7310\",\"url\":\"https:\/\/drillingcontractor.org\/shell-launches-phase-ii-of-parque-das-conchas-offshore-brazil-project-exceeds-production-targets-7310\",\"name\":\"Shell launches phase II of Parque das Conchas offshore Brazil: Project exceeds production targets - Drilling Contractor\",\"isPartOf\":{\"@id\":\"https:\/\/drillingcontractor.org\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/drillingcontractor.org\/shell-launches-phase-ii-of-parque-das-conchas-offshore-brazil-project-exceeds-production-targets-7310#primaryimage\"},\"image\":{\"@id\":\"https:\/\/drillingcontractor.org\/shell-launches-phase-ii-of-parque-das-conchas-offshore-brazil-project-exceeds-production-targets-7310#primaryimage\"},\"thumbnailUrl\":\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2010\/10\/shell-300x180.jpg\",\"datePublished\":\"2010-10-15T18:41:13+00:00\",\"dateModified\":\"2010-10-15T18:41:48+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/drillingcontractor.org\/shell-launches-phase-ii-of-parque-das-conchas-offshore-brazil-project-exceeds-production-targets-7310#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/drillingcontractor.org\/shell-launches-phase-ii-of-parque-das-conchas-offshore-brazil-project-exceeds-production-targets-7310\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/drillingcontractor.org\/shell-launches-phase-ii-of-parque-das-conchas-offshore-brazil-project-exceeds-production-targets-7310#primaryimage\",\"url\":\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2010\/10\/shell.jpg\",\"contentUrl\":\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2010\/10\/shell.jpg\",\"width\":\"333\",\"height\":\"200\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/drillingcontractor.org\/shell-launches-phase-ii-of-parque-das-conchas-offshore-brazil-project-exceeds-production-targets-7310#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/drillingcontractor.org\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Shell launches phase II of Parque das Conchas offshore Brazil: Project exceeds production targets\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/drillingcontractor.org\/#website\",\"url\":\"https:\/\/drillingcontractor.org\/\",\"name\":\"Drilling Contractor\",\"description\":\"Get the latest oil drilling news with DrillingContractor.org\",\"publisher\":{\"@id\":\"https:\/\/drillingcontractor.org\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/drillingcontractor.org\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/drillingcontractor.org\/#organization\",\"name\":\"Drilling Contractor Magazine\",\"url\":\"https:\/\/drillingcontractor.org\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/drillingcontractor.org\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2015\/04\/logo-login2.jpg\",\"contentUrl\":\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2015\/04\/logo-login2.jpg\",\"width\":200,\"height\":68,\"caption\":\"Drilling Contractor Magazine\"},\"image\":{\"@id\":\"https:\/\/drillingcontractor.org\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"http:\/\/www.facebook.com\/pages\/Drilling-Contractor-Magazine\/112140675010\",\"https:\/\/x.com\/DC_Magazine\",\"https:\/\/www.linkedin.com\/grp\/home?gid=1810343\",\"https:\/\/www.youtube.com\/channel\/UC0xXkxpL1WTf99-oLW8Z9hg\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/drillingcontractor.org\/#\/schema\/person\/4a6fe020ea30ed5fafc20070dd3c31a8\",\"name\":\"Brian Parks\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/drillingcontractor.org\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/a2a4df8466b888846397716aad1e351da24db1f1bf1b1c579638487317502b0a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/a2a4df8466b888846397716aad1e351da24db1f1bf1b1c579638487317502b0a?s=96&d=mm&r=g\",\"caption\":\"Brian Parks\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Shell launches phase II of Parque das Conchas offshore Brazil: Project exceeds production targets - Drilling Contractor","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/drillingcontractor.org\/shell-launches-phase-ii-of-parque-das-conchas-offshore-brazil-project-exceeds-production-targets-7310","og_locale":"en_US","og_type":"article","og_title":"Shell launches phase II of Parque das Conchas offshore Brazil: Project exceeds production targets - Drilling Contractor","og_description":"Shell announced on 14 October new investment to support phase II of the prolific deepwater Parque das Conchas...","og_url":"https:\/\/drillingcontractor.org\/shell-launches-phase-ii-of-parque-das-conchas-offshore-brazil-project-exceeds-production-targets-7310","og_site_name":"Drilling Contractor","article_publisher":"http:\/\/www.facebook.com\/pages\/Drilling-Contractor-Magazine\/112140675010","article_published_time":"2010-10-15T18:41:13+00:00","article_modified_time":"2010-10-15T18:41:48+00:00","og_image":[{"width":333,"height":200,"url":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2010\/10\/shell.jpg","type":"image\/jpeg"}],"author":"Brian Parks","twitter_card":"summary_large_image","twitter_creator":"@DC_Magazine","twitter_site":"@DC_Magazine","twitter_misc":{"Written by":"Brian Parks","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/drillingcontractor.org\/shell-launches-phase-ii-of-parque-das-conchas-offshore-brazil-project-exceeds-production-targets-7310#article","isPartOf":{"@id":"https:\/\/drillingcontractor.org\/shell-launches-phase-ii-of-parque-das-conchas-offshore-brazil-project-exceeds-production-targets-7310"},"author":{"name":"Brian Parks","@id":"https:\/\/drillingcontractor.org\/#\/schema\/person\/4a6fe020ea30ed5fafc20070dd3c31a8"},"headline":"Shell launches phase II of Parque das Conchas offshore Brazil: Project exceeds production targets","datePublished":"2010-10-15T18:41:13+00:00","dateModified":"2010-10-15T18:41:48+00:00","mainEntityOfPage":{"@id":"https:\/\/drillingcontractor.org\/shell-launches-phase-ii-of-parque-das-conchas-offshore-brazil-project-exceeds-production-targets-7310"},"wordCount":365,"commentCount":0,"publisher":{"@id":"https:\/\/drillingcontractor.org\/#organization"},"image":{"@id":"https:\/\/drillingcontractor.org\/shell-launches-phase-ii-of-parque-das-conchas-offshore-brazil-project-exceeds-production-targets-7310#primaryimage"},"thumbnailUrl":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2010\/10\/shell-300x180.jpg","articleSection":["News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/drillingcontractor.org\/shell-launches-phase-ii-of-parque-das-conchas-offshore-brazil-project-exceeds-production-targets-7310#respond"]}]},{"@type":"WebPage","@id":"https:\/\/drillingcontractor.org\/shell-launches-phase-ii-of-parque-das-conchas-offshore-brazil-project-exceeds-production-targets-7310","url":"https:\/\/drillingcontractor.org\/shell-launches-phase-ii-of-parque-das-conchas-offshore-brazil-project-exceeds-production-targets-7310","name":"Shell launches phase II of Parque das Conchas offshore Brazil: Project exceeds production targets - Drilling Contractor","isPartOf":{"@id":"https:\/\/drillingcontractor.org\/#website"},"primaryImageOfPage":{"@id":"https:\/\/drillingcontractor.org\/shell-launches-phase-ii-of-parque-das-conchas-offshore-brazil-project-exceeds-production-targets-7310#primaryimage"},"image":{"@id":"https:\/\/drillingcontractor.org\/shell-launches-phase-ii-of-parque-das-conchas-offshore-brazil-project-exceeds-production-targets-7310#primaryimage"},"thumbnailUrl":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2010\/10\/shell-300x180.jpg","datePublished":"2010-10-15T18:41:13+00:00","dateModified":"2010-10-15T18:41:48+00:00","breadcrumb":{"@id":"https:\/\/drillingcontractor.org\/shell-launches-phase-ii-of-parque-das-conchas-offshore-brazil-project-exceeds-production-targets-7310#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/drillingcontractor.org\/shell-launches-phase-ii-of-parque-das-conchas-offshore-brazil-project-exceeds-production-targets-7310"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/drillingcontractor.org\/shell-launches-phase-ii-of-parque-das-conchas-offshore-brazil-project-exceeds-production-targets-7310#primaryimage","url":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2010\/10\/shell.jpg","contentUrl":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2010\/10\/shell.jpg","width":"333","height":"200"},{"@type":"BreadcrumbList","@id":"https:\/\/drillingcontractor.org\/shell-launches-phase-ii-of-parque-das-conchas-offshore-brazil-project-exceeds-production-targets-7310#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/drillingcontractor.org\/"},{"@type":"ListItem","position":2,"name":"Shell launches phase II of Parque das Conchas offshore Brazil: Project exceeds production targets"}]},{"@type":"WebSite","@id":"https:\/\/drillingcontractor.org\/#website","url":"https:\/\/drillingcontractor.org\/","name":"Drilling Contractor","description":"Get the latest oil drilling news with DrillingContractor.org","publisher":{"@id":"https:\/\/drillingcontractor.org\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/drillingcontractor.org\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/drillingcontractor.org\/#organization","name":"Drilling Contractor Magazine","url":"https:\/\/drillingcontractor.org\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/drillingcontractor.org\/#\/schema\/logo\/image\/","url":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2015\/04\/logo-login2.jpg","contentUrl":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2015\/04\/logo-login2.jpg","width":200,"height":68,"caption":"Drilling Contractor Magazine"},"image":{"@id":"https:\/\/drillingcontractor.org\/#\/schema\/logo\/image\/"},"sameAs":["http:\/\/www.facebook.com\/pages\/Drilling-Contractor-Magazine\/112140675010","https:\/\/x.com\/DC_Magazine","https:\/\/www.linkedin.com\/grp\/home?gid=1810343","https:\/\/www.youtube.com\/channel\/UC0xXkxpL1WTf99-oLW8Z9hg"]},{"@type":"Person","@id":"https:\/\/drillingcontractor.org\/#\/schema\/person\/4a6fe020ea30ed5fafc20070dd3c31a8","name":"Brian Parks","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/drillingcontractor.org\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/a2a4df8466b888846397716aad1e351da24db1f1bf1b1c579638487317502b0a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/a2a4df8466b888846397716aad1e351da24db1f1bf1b1c579638487317502b0a?s=96&d=mm&r=g","caption":"Brian Parks"}}]}},"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/posts\/7310","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/comments?post=7310"}],"version-history":[{"count":0,"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/posts\/7310\/revisions"}],"wp:attachment":[{"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/media?parent=7310"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/categories?post=7310"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/tags?post=7310"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}