{"id":62595,"date":"2022-03-15T13:34:34","date_gmt":"2022-03-15T18:34:34","guid":{"rendered":"https:\/\/drillingcontractor.org\/?page_id=62595"},"modified":"2022-04-21T08:43:16","modified_gmt":"2022-04-21T13:43:16","slug":"march-april-2022","status":"publish","type":"page","link":"https:\/\/drillingcontractor.org\/dc-archive\/march-april-2022","title":{"rendered":"March\/April 2022"},"content":{"rendered":"<div class=\"whtTbl\">\n<table>\n<tbody>\n<tr>\n<th align=\"left\">Looking for the Digital Reader version of this issue? <a href=\"https:\/\/drillingcontractor.org\/reader\/2022\/nabors-0322.html\">Click here!<\/a><\/th>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/reader\/2022\/nabors-0322.html\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone\" src=\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2022\/03\/DR-Hero-MA22-email-780x470.png\" alt=\"Digital Reader edition\" width=\"300\" height=\"158\" align=\"right\"><\/a><em>DC<\/em>&#8216;s Digital Reader is a faithful recreation of the printed magazine, in digital form! Digital Reader can be viewed on an iPad or Android tablet, and\/or your Windows or Mac OSX computer.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<div class=\"whtTbl\">\n<table>\n<tbody>\n<tr>\n<th>Innovating While Drilling<\/th>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=62489\"> <strong>Digital technologies support new workflows in drill bit forensics<\/strong><br \/>\n<em>AI and machine learning allow for dull wear data to be easily collected, digitized and analyzed, leading to better bit designs, optimized drilling<\/em><\/a><br \/>\n<em>By Stephen Forrester, Contributor<\/em><\/td>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=62559\"> <strong>IADC ART Committee moves closer to launching updated drill bit dull grading system<\/strong> <\/a><br \/>\n<em>By Stephen Whitfield, Associate Editor<\/em><\/td>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=62500\"> <strong>Industry seeks ways to understand and fight elusive downhole enemies<\/strong><br \/>\n<em>Dysfunctions like HFTO can be hard to detect, but companies are identifying mitigation solutions through sensors, bit studies, predictive software<\/em><\/a><br \/>\n<em>By Stephen Whitfield, Associate Editor<\/em><\/td>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=62477\"><strong>Multilayer mapping-while-drilling service delivers real-time insights to optimize reservoir exposure<\/strong><\/a><br \/>\n<em>By Vera Krissetiawati Wibowo and Haifeng Wang, Schlumberger<\/em><\/td>\n<\/tr>\n<tr>\n<th>Improving Fracking Power &amp; Efficiency<\/th>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=62552\"> <strong>Power quest: Innovations in frac equipment push horsepower boundaries<\/strong><br \/>\n<em>As 5,000-hp becomes the norm, manufacturers focus on delivering pumps and engines with higher power density, durability<\/em><\/a><br \/>\n<em>By Stephen Whitfield, Associate Editor<\/em><\/p>\n<ul>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=62548\"> <strong>Field trials demonstrate e-frac efficiencies<\/strong> <\/a><br \/>\n<em>By Stephen Whitfield, Associate Editor<\/em><\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=62471\"> <strong>Automated predictive frac control system taps operator&rsquo;s machine-learning model to improve completion execution<\/strong> <\/a><br \/>\n<em>By Jessica Whiteside, Contributor<\/em><\/td>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=62540\"> <strong>Integrated platform aims to improve real-time decision making in frac operations<\/strong> <\/a><br \/>\n<em>By Stephen Whitfield, Associate Editor<\/em><\/td>\n<\/tr>\n<tr>\n<th>IADC Connection<\/th>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=62463\"><strong>From the President: IADC, members keep focus on people, collaboration, industry value<\/strong><\/a><br \/>\n<em>By Jason McFarland, IADC President<\/em><\/td>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=62517\"><strong>News Cuttings<\/strong><\/a><\/p>\n<ul>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=62517#nc1\"><strong>IADC DrillingIN podcast highlights Well Integrity book<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=62517#nc2\"><strong>IADC committee, IPIECA engage on sustainability roadmap, reporting<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=62517#nc3\"><strong>IADC, SPE student chapters hold joint CCUS workshop <\/strong><\/a><\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=62483\"><strong>Wirelines<\/strong><\/a><\/p>\n<ul>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=62483#w1\"><strong>IADC concerned over Bureau of Land Management&rsquo;s missed Q1 lease sale deadline<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=62483#w2\"><strong>RRC launches database for flaring, venting applications<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=62483#w3\"><strong>API appeals ruling invalidating 2021 federal lease sale<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=62483#w4\"><strong>DOE issues cyber notice amid Russia&rsquo;s war in Ukraine<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=62483#w5\"><strong>API comments on proposed EPA methane regulations<\/strong><\/a><\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<th>Departments<\/th>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=62467\"><strong>Drilling Ahead: Volatility besets global economy, oil and gas markets amid Russia&rsquo;s war<\/strong><\/a><br \/>\n<em>By Linda Hsieh, Editor &amp; Publisher<\/em><\/td>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=62506\"><strong> D&amp;C News<\/strong><\/a><\/p>\n<ul>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=62506#DCN1\"><strong> KCA Deutag wins contract extensions in Europe, 10-year contract to provide 4 new rigs in Oman<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=62506#DCN2\"><strong> Contract wins for Valaris semi in US GOM, Mexico<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=62506#DCN3\"><strong> Graff-1 well finds oil in deepwater Namibia<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=62506#DCN4\"><strong> Appraisal well delineates Winterfell potential in GOM<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=62506#DCN5\"><strong> TotalEnergies, Petrofac hire Stena Drilling semisubmersibles to work on UKCS<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=62506#DCN6\"><strong> Maersk secures contract extensions in Malaysia, new contract in Denmark<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=62506#DCN7\"><strong> Deepsea Nordkapp confirmed to drill Kobra East Gekko development wells for Aker BP<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=62506#DCN8\"><strong> APA Corp sees exploration success with KBD-1 well in Block 58 offshore Suriname<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=62506#DCN9\"><strong> Liza Phase 2 starts production in Guyana, set to reach capacity later this year<\/strong><\/a><\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=62510\"><strong>D&amp;C Tech Digest<\/strong><\/a><\/p>\n<ul>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=62510#DCTD1\"><strong>New system aims to halve geothermal well costs<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=62510#DCTD2\"><strong>Added capacity at Port Esbjerg allows Maersk Drilling jackup to use shore-to-ship power <\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=62510#DCTD3\"><strong>Replacing large-diameter seals in-situ can help to reduce FPSO downtime<\/strong><\/a><\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=62513\"><strong>News Briefs: Environmental, Social and Governance<\/strong><\/a><\/p>\n<ul>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=62513#esg1\"><strong>Transocean to drill wells for Northern Lights project<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=62513#esg2\"><strong>Parker outlines plan to achieve new goals in ESG report <\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=62513#esg3\"><strong>Hess earns 100% score on Corporate Equality Index <\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=62513#esg4\"><strong>Chevron seeks to certify environmental performance of select US land assets<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=62513#esg5\"><strong>DNV report: Energy transition is accelerating, but skills shortage is critical challenge<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=62513#esg6\"><strong>New offshore green hydrogen project to begin this year <\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=62513#esg7\"><strong>Survey confirms COVID-19 advanced actions on ESG <\/strong><\/a><\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=62535\"><strong>Oil &amp; Gas Markets<\/strong><\/a><\/p>\n<ul>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=62535#ogmar1\"><strong>Texas Petro Index: Strong crude prices drive recovery of state&rsquo;s E&amp;P economy<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=62535#ogmar2\"><strong>Rystad Energy: Permian is &lsquo;entering a 3-mile lateral era&rsquo; <\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=62535#ogmar3\"><strong>Oil and gas M&amp;A&rsquo;s increased by 16% in 2021, with highest values in upstream sector<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=62535#ogmar4\"><strong>Westwood: Nearly 47,000 onshore wells to be drilled around the world this year<\/strong><\/a><\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=62474\"><strong>HSE&amp;T Corner: New study highlights impact of COVID-19 on mental health of offshore workers in Australia<\/strong><\/a><br \/>\n<em> By Stephen Whitfield, Associate Editor<\/em><\/td>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=62530\"><strong>People, Companies and Products<\/strong><\/a><\/p>\n<ul>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=62530#ppl1\"><strong>NOV acquires ADS to offer integrated MPD solutions<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=62530#ppl2\"><strong>LYTT, Weatherford sign collaboration agreement<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=62530#ppl3\"><strong>Jindal, Hunting to build premium OCTG threading plant in India <\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=62530#ppl4\"><strong>Data Gumbo opens office in Saudi, signs contract with Equinor <\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=62530#ppl5\"><strong>ADNOC awards $1.94 billion in wireline, perforation deals <\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=62530#ppl6\"><strong>eDrilling, ACE to provide AI solution for well construction &nbsp; <\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=62530#ppl7\"><strong>Enteq launches new center to grow directional drilling tool <\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=62530#ppl8\"><strong>New training center to help build workforce in Guyana <\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=62530#ppl9\"><strong>Waukesha achieves new ISO 45001:2018 certification &nbsp; <\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=62530#ppl10\"><strong>Daniels named to new sustainability role at Shell <\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=62530#ppl11\"><strong>Trelleborg promotes Castleman to M&amp;A Director <\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=62530#ppl12\"><strong>McDermott names McKelvy as new President, CEO&nbsp; <\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=62530#ppl13\"><strong>OEG signs distribution agreement with Blue Manta <\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=62530#ppl14\"><strong>Borr selects IFS solutions <\/strong><\/a><\/li>\n<\/ul>\n<p><em> Products<\/em><\/p>\n<ul>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=62530#prods1\"><strong>New frac plug, data analytics tool aim to improve frac efficiency <\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=62530#prods2\"><strong>Tenaris eliminates manual operations with connector&rsquo;s anti-rotational keys activation &nbsp; <\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=62530#prods3\"><strong>Lloyd&rsquo;s Register updates AllAssets asset management software<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=62530#prods4\"><strong>Flow diagnostics platform targets horizontal wells<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=62530#prods5\"><strong>Web-based tool helps to calculate carbon footprint<\/strong><\/a><\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=62485\"><strong>Perspectives: Matt Isbell, Hess &ndash; Integration, standardization will help propel well construction performance to the next level<\/strong><\/a><br \/>\n<em> By Linda Hsieh, Editor &amp; Publisher<\/em><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Looking for the Digital Reader version of this issue? Click here! DC&#8216;s Digital Reader is a faithful recreation of the printed magazine, in digital form! Digital Reader can be viewed on an iPad or Android tablet, and\/or your Windows or Mac OSX computer. Innovating While Drilling Digital technologies support new workflows in drill bit forensics &hellip;<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":62,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-62595","page","type-page","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.1.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>March\/April 2022 - Drilling Contractor<\/title>\n<meta name=\"description\" content=\"Get oil and gas drilling news, videos, ebooks &amp; more with the official magazine for the International Association of Drilling Contractors...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/drillingcontractor.org\/dc-archive\/march-april-2022\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"March\/April 2022 - Drilling Contractor\" \/>\n<meta property=\"og:description\" content=\"Get oil and gas drilling news, videos, ebooks &amp; more with the official magazine for the International Association of Drilling Contractors...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/drillingcontractor.org\/dc-archive\/march-april-2022\" \/>\n<meta property=\"og:site_name\" content=\"Drilling Contractor\" \/>\n<meta property=\"article:publisher\" content=\"http:\/\/www.facebook.com\/pages\/Drilling-Contractor-Magazine\/112140675010\" \/>\n<meta property=\"article:modified_time\" content=\"2022-04-21T13:43:16+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2022\/03\/DR-Hero-MA22-email-780x470.png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@DC_Magazine\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/drillingcontractor.org\/dc-archive\/march-april-2022\",\"url\":\"https:\/\/drillingcontractor.org\/dc-archive\/march-april-2022\",\"name\":\"March\/April 2022 - Drilling Contractor\",\"isPartOf\":{\"@id\":\"https:\/\/drillingcontractor.org\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/drillingcontractor.org\/dc-archive\/march-april-2022#primaryimage\"},\"image\":{\"@id\":\"https:\/\/drillingcontractor.org\/dc-archive\/march-april-2022#primaryimage\"},\"thumbnailUrl\":\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2022\/03\/DR-Hero-MA22-email-780x470.png\",\"datePublished\":\"2022-03-15T18:34:34+00:00\",\"dateModified\":\"2022-04-21T13:43:16+00:00\",\"description\":\"Get oil and gas drilling news, videos, ebooks & more with the official magazine for the International Association of Drilling Contractors...\",\"breadcrumb\":{\"@id\":\"https:\/\/drillingcontractor.org\/dc-archive\/march-april-2022#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/drillingcontractor.org\/dc-archive\/march-april-2022\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/drillingcontractor.org\/dc-archive\/march-april-2022#primaryimage\",\"url\":\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2022\/03\/DR-Hero-MA22-email.png\",\"contentUrl\":\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2022\/03\/DR-Hero-MA22-email.png\",\"width\":1240,\"height\":660},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/drillingcontractor.org\/dc-archive\/march-april-2022#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/drillingcontractor.org\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"DC Archive\",\"item\":\"https:\/\/drillingcontractor.org\/dc-archive\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"March\/April 2022\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/drillingcontractor.org\/#website\",\"url\":\"https:\/\/drillingcontractor.org\/\",\"name\":\"Drilling Contractor\",\"description\":\"Get the latest oil drilling news with DrillingContractor.org\",\"publisher\":{\"@id\":\"https:\/\/drillingcontractor.org\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/drillingcontractor.org\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/drillingcontractor.org\/#organization\",\"name\":\"Drilling Contractor Magazine\",\"url\":\"https:\/\/drillingcontractor.org\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/drillingcontractor.org\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2015\/04\/logo-login2.jpg\",\"contentUrl\":\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2015\/04\/logo-login2.jpg\",\"width\":200,\"height\":68,\"caption\":\"Drilling Contractor Magazine\"},\"image\":{\"@id\":\"https:\/\/drillingcontractor.org\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"http:\/\/www.facebook.com\/pages\/Drilling-Contractor-Magazine\/112140675010\",\"https:\/\/x.com\/DC_Magazine\",\"https:\/\/www.linkedin.com\/grp\/home?gid=1810343\",\"https:\/\/www.youtube.com\/channel\/UC0xXkxpL1WTf99-oLW8Z9hg\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"March\/April 2022 - Drilling Contractor","description":"Get oil and gas drilling news, videos, ebooks & more with the official magazine for the International Association of Drilling Contractors...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/drillingcontractor.org\/dc-archive\/march-april-2022","og_locale":"en_US","og_type":"article","og_title":"March\/April 2022 - Drilling Contractor","og_description":"Get oil and gas drilling news, videos, ebooks & more with the official magazine for the International Association of Drilling Contractors...","og_url":"https:\/\/drillingcontractor.org\/dc-archive\/march-april-2022","og_site_name":"Drilling Contractor","article_publisher":"http:\/\/www.facebook.com\/pages\/Drilling-Contractor-Magazine\/112140675010","article_modified_time":"2022-04-21T13:43:16+00:00","og_image":[{"url":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2022\/03\/DR-Hero-MA22-email-780x470.png","type":"","width":"","height":""}],"twitter_card":"summary_large_image","twitter_site":"@DC_Magazine","twitter_misc":{"Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/drillingcontractor.org\/dc-archive\/march-april-2022","url":"https:\/\/drillingcontractor.org\/dc-archive\/march-april-2022","name":"March\/April 2022 - Drilling Contractor","isPartOf":{"@id":"https:\/\/drillingcontractor.org\/#website"},"primaryImageOfPage":{"@id":"https:\/\/drillingcontractor.org\/dc-archive\/march-april-2022#primaryimage"},"image":{"@id":"https:\/\/drillingcontractor.org\/dc-archive\/march-april-2022#primaryimage"},"thumbnailUrl":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2022\/03\/DR-Hero-MA22-email-780x470.png","datePublished":"2022-03-15T18:34:34+00:00","dateModified":"2022-04-21T13:43:16+00:00","description":"Get oil and gas drilling news, videos, ebooks & more with the official magazine for the International Association of Drilling Contractors...","breadcrumb":{"@id":"https:\/\/drillingcontractor.org\/dc-archive\/march-april-2022#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/drillingcontractor.org\/dc-archive\/march-april-2022"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/drillingcontractor.org\/dc-archive\/march-april-2022#primaryimage","url":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2022\/03\/DR-Hero-MA22-email.png","contentUrl":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2022\/03\/DR-Hero-MA22-email.png","width":1240,"height":660},{"@type":"BreadcrumbList","@id":"https:\/\/drillingcontractor.org\/dc-archive\/march-april-2022#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/drillingcontractor.org\/"},{"@type":"ListItem","position":2,"name":"DC Archive","item":"https:\/\/drillingcontractor.org\/dc-archive"},{"@type":"ListItem","position":3,"name":"March\/April 2022"}]},{"@type":"WebSite","@id":"https:\/\/drillingcontractor.org\/#website","url":"https:\/\/drillingcontractor.org\/","name":"Drilling Contractor","description":"Get the latest oil drilling news with DrillingContractor.org","publisher":{"@id":"https:\/\/drillingcontractor.org\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/drillingcontractor.org\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/drillingcontractor.org\/#organization","name":"Drilling Contractor Magazine","url":"https:\/\/drillingcontractor.org\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/drillingcontractor.org\/#\/schema\/logo\/image\/","url":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2015\/04\/logo-login2.jpg","contentUrl":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2015\/04\/logo-login2.jpg","width":200,"height":68,"caption":"Drilling Contractor Magazine"},"image":{"@id":"https:\/\/drillingcontractor.org\/#\/schema\/logo\/image\/"},"sameAs":["http:\/\/www.facebook.com\/pages\/Drilling-Contractor-Magazine\/112140675010","https:\/\/x.com\/DC_Magazine","https:\/\/www.linkedin.com\/grp\/home?gid=1810343","https:\/\/www.youtube.com\/channel\/UC0xXkxpL1WTf99-oLW8Z9hg"]}]}},"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/pages\/62595","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/comments?post=62595"}],"version-history":[{"count":4,"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/pages\/62595\/revisions"}],"predecessor-version":[{"id":62882,"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/pages\/62595\/revisions\/62882"}],"up":[{"embeddable":true,"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/pages\/62"}],"wp:attachment":[{"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/media?parent=62595"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}