{"id":60133,"date":"2021-04-27T11:17:51","date_gmt":"2021-04-27T16:17:51","guid":{"rendered":"https:\/\/drillingcontractor.org\/?page_id=60133"},"modified":"2021-05-06T08:38:15","modified_gmt":"2021-05-06T13:38:15","slug":"may-june-2021","status":"publish","type":"page","link":"https:\/\/drillingcontractor.org\/dc-archive\/may-june-2021","title":{"rendered":"May\/June 2021"},"content":{"rendered":"<div class=\"whtTbl\">\n<table>\n<tbody>\n<tr>\n<th align=\"left\">Looking for the Digital Reader version of this issue? <a href=\"https:\/\/drillingcontractor.org\/digital-reader-mayjun-2021-60140\">Click here!<\/a><\/th>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/digital-reader-mayjun-2021-60140\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2021\/04\/DR-Hero-MJ21-email.png\" alt=\"Digital Reader edition\" width=\"300\" height=\"158\" align=\"right\"><\/a><em>DC<\/em>&#8216;s Digital Reader is a faithful recreation of the printed magazine, in digital form! Digital Reader can be viewed on an iPad or Android tablet, and\/or your Windows or Mac OSX computer.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<div class=\"whtTbl\">\n<table>\n<tbody>\n<tr>\n<th>Unconventional Resources<\/th>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=60018\"> <strong>Permian sees the start of a cautious recovery <\/strong><br \/>\n<em>Rig count and wells drilled are both expected to rise this year, but return to pre-downturn activity won&rsquo;t happen at current operator spending levels<\/em><\/a><br \/>\n<em>By Stephen Whitfield, Associate Editor<\/em><\/td>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=60040\"><strong>Shale operators prioritize spending discipline and ESG, but emphasize need for supportive public policies<\/strong><\/a><br \/>\n<em>By Stephen Forrester, Contributor<\/em><\/td>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=60013\"><strong>Industry investment and regulatory support needed to tap full potential of Vaca Muerta, Brazilian pre-salt gas<\/strong><\/a><br \/>\n<em>By Stephen Whitfield, Associate Editor<\/em><\/td>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=59983\"><strong>Increased hydrocarbon production, sustainability programs<br \/>\ngo hand in hand to create a resilient upstream<\/strong><\/a><br \/>\n<em>By Stephen Forrester, Contributor<\/em><\/td>\n<\/tr>\n<tr>\n<th>Offshore<\/th>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=60031\"> <strong>Exploration boom in Guyana-Suriname: high dollar, high stakes <\/strong><br \/>\n<em>Giant-sized discoveries and low breakevens continue to fan enthusiasm for this South American basin despite recent disappointments<\/em><\/a><br \/>\n<em> By Stephen Whitfield, Associate Editor<\/em><\/td>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=60132\"><strong>Campos Basin sees diversification of operators, renewed commitment for investments to boost production<\/strong><\/a><br \/>\n<em>By Stephen Forrester, Contributor<\/em><\/td>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=59994\"><strong>NOCs from Africa, South America seek to boost competitiveness by investing in gas, renewables<\/strong><\/a><br \/>\n<em>By Stephen Whitfield, Associate Editor<\/em><\/td>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=59988\"><strong>Expandable liner system mitigates geological challenges, predictably maintains hole size in Ekofisk wells<br \/>\n<\/strong><\/a><\/td>\n<\/tr>\n<tr>\n<th>Completions<\/th>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=59991\"> <strong>Drill pipe logging sub uses real-time downhole data to improve liner, lower completion installations <\/strong><\/a><br \/>\n<em> By Kim Mathisen, Tore Sorheim, Vijay Kumar Keerthivasan and Dustin Young, NOV Completion; Stephen Pink, NOV Wellbore Technologies<\/em><\/td>\n<\/tr>\n<tr>\n<th>Wellsite Communications<\/th>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=59980\"> <strong>Formalizing communications could lead to better decisions at wellsite <\/strong><\/a><br \/>\n<em> By Stephen Whitfield, Associate Editor <\/em><\/td>\n<\/tr>\n<tr>\n<th>Health, Safety, Environment &amp; Training<\/th>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=60006\"> <strong>Evolution of BP&rsquo;s self-verification encompasses digital app, targeting of barriers at component level <\/strong><\/a><br \/>\n<em> By Linda Hsieh, Editor and Publisher <\/em><\/td>\n<\/tr>\n<tr>\n<th>IADC Connection<\/th>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=60068\"><strong>From the Chairman: Industry should be lauded for keeping crews working and focused amid COVID challenges <\/strong><\/a><br \/>\n<em>By R.H. &ldquo;Bob&rdquo; Geddes, 2021 IADC Chairman<\/em><\/td>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=60002\"><strong>News Cuttings<\/strong><\/a><\/p>\n<ul>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=59573#nc1\"><strong>IADC KREW leads evolution in well control training<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=59573#nc2\"><strong>IADC establishes new sustainability committee<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=59573#nc3\"><strong>Latin America Chapter Chair to speak at upcoming Guyana, Suriname events<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=59573#nc4\"><strong>ART Committee announces officers, holds 2 virtual events<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=59573#nc5\"><strong>IADC DEC Committee to hold Geothermal Forum on 30 June<\/strong><\/a><\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=59999\"><strong>Wirelines<\/strong><\/a><\/p>\n<ul>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=59999#w1\"><strong>IADC encourages members to review and submit comments on ISO&rsquo;s draft offshore conductor standard<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=59999#w2\"><strong>New study published on BSEE offshore inspection program<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=59999#w3\"><strong>API announces MOU&rsquo;s for Guyana and Africa<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=59999#w4\"><strong>NOIA elects Tim Duncan of Talos Energy as Chairman<\/strong><\/a><\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<th>Departments<\/th>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=60065\"><strong>Drilling Ahead: SEC calls for comments on climate change disclosures<\/strong><\/a><br \/>\n<em>By Linda Hsieh, Editor &amp; Publisher<\/em><\/td>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=60052\"><strong> D&amp;C News<\/strong><\/a><\/p>\n<ul>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=60052#DCN1\"><strong> Discovery announced at Puma West well in US GOM<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=60052#DCN2\"><strong> Odfjell wins extension of contract for Deepsea Nordkapp<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=60052#DCN3\"><strong> Tullow begins multi-well campaign on jubilee field with Maersk Venturer<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=60052#DCN4\"><strong> Equinor discovers oil in North Sea&rsquo;s blasto prospect<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=60052#DCN5\"><strong> Maersk Viking awarded work offshore Gabon, Malaysia<\/strong><\/a><\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=60056\"><strong>D&amp;C Tech Digest<\/strong><\/a><\/p>\n<ul>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=60056#DCTD1\"><strong>Open Group technology consortium launches Mercury Release of OSDU Data Platform<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=60056#DCTD2\"><strong>Horizontal Subsea trees installed without a drilling rig<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=60056#DCTD3\"><strong>Workstrings provides drill pipe for record-breaking flowline cleanout in GOM<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=60056#DCTD4\"><strong>Rig trial completed for integrated MPD\/automated Well Control technologies<\/strong><\/a><\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=60000\"><strong>News Briefs: Environmental, Social and Governance<\/strong><\/a><\/p>\n<ul>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=60000#esg1\"><strong>Neptune, EDF collaborate to seek reliable approach for measuring methane emissions from offshore facilities<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=60000#esg2\"><strong>BP details new goals, 2020 progress in sustainability report<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=60000#esg3\"><strong>API Outlines low-carbon policy in new climate change action framework<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=60000#esg4\"><strong>Baker Hughes signs MOU to contribute to Polaris carbon storage project<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=60000#esg5\"><strong>WoodMac analysis shows how carbon pricing plans could impact upstream economics <\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=60000#esg6\"><strong>Equinor-backed projects secure UK government funding<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=60000#esg7\"><strong>Shell Outlines goals in NEW sustainability report <\/strong><\/a><\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=60011\"><strong>People, Companies and Products<\/strong><\/a><\/p>\n<ul>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=60011#ppl1\"><strong>Noble Corp completes acquisition of Pacific Drilling<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=60011#ppl2\"><strong>Tenaris prepares Texas facility for activity ramp-up<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=60011#ppl3\"><strong>Expro, FTAI Ocean form well intervention alliance <\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=60011#ppl4\"><strong>Reelwell to supply DualLink wired drill pipe to Nabors<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=60011#ppl5\"><strong>FET partners with Deepsea Technologies in Brazil <\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=60011#ppl6\"><strong>Kosmos announces new exploration leadership<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=60011#ppl7\"><strong>Ashtead, OAP complete project offshore Angola <\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=60011#ppl8\"><strong>Energy recruitment specialists join forces <\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=60011#ppl9\"><strong>Dynamic Cloud to represent FutureOn in Saudi Arabia<\/strong><\/a><\/li>\n<\/ul>\n<p><em> Products<\/em><\/p>\n<ul>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=60011#prods1\"><strong>Infostat rolls out IADC DDR Plus as part of RIMDrill system<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=60011#prods2\"><strong>New flexible pipe solution addresses cracking in high CO<sub>2<\/sub> content fields&nbsp; <\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=60011#prods3\"><strong>DNV issues 3D printing service specification<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=60011#prods4\"><strong>Advanced metal alloy enables new completions technology<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=60011#prods5\"><strong>ABS brings NASA&rsquo;s testing technology to offshore assets<\/strong><\/a><\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=60071\"><strong>Perspectives: Seadrill&rsquo;s Derek Hibbard &ndash; Spending time on rigs to connect with people who do the work is crucial for safety, performance<\/strong><\/a><br \/>\n<em> By Linda Hsieh, Editor &amp; Publisher<\/em><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Looking for the Digital Reader version of this issue? Click here! DC&#8216;s Digital Reader is a faithful recreation of the printed magazine, in digital form! Digital Reader can be viewed on an iPad or Android tablet, and\/or your Windows or Mac OSX computer. Unconventional Resources Permian sees the start of a cautious recovery Rig count &hellip;<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":62,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-60133","page","type-page","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.1.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>May\/June 2021 - Drilling Contractor<\/title>\n<meta name=\"description\" content=\"Get oil and gas drilling news, videos, ebooks &amp; more with the official magazine for the International Association of Drilling Contractors...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/drillingcontractor.org\/dc-archive\/may-june-2021\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"May\/June 2021 - Drilling Contractor\" \/>\n<meta property=\"og:description\" content=\"Get oil and gas drilling news, videos, ebooks &amp; more with the official magazine for the International Association of Drilling Contractors...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/drillingcontractor.org\/dc-archive\/may-june-2021\" \/>\n<meta property=\"og:site_name\" content=\"Drilling Contractor\" \/>\n<meta property=\"article:publisher\" content=\"http:\/\/www.facebook.com\/pages\/Drilling-Contractor-Magazine\/112140675010\" \/>\n<meta property=\"article:modified_time\" content=\"2021-05-06T13:38:15+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2021\/04\/DR-Hero-MJ21-email.png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@DC_Magazine\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/drillingcontractor.org\/dc-archive\/may-june-2021\",\"url\":\"https:\/\/drillingcontractor.org\/dc-archive\/may-june-2021\",\"name\":\"May\/June 2021 - Drilling Contractor\",\"isPartOf\":{\"@id\":\"https:\/\/drillingcontractor.org\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/drillingcontractor.org\/dc-archive\/may-june-2021#primaryimage\"},\"image\":{\"@id\":\"https:\/\/drillingcontractor.org\/dc-archive\/may-june-2021#primaryimage\"},\"thumbnailUrl\":\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2021\/04\/DR-Hero-MJ21-email.png\",\"datePublished\":\"2021-04-27T16:17:51+00:00\",\"dateModified\":\"2021-05-06T13:38:15+00:00\",\"description\":\"Get oil and gas drilling news, videos, ebooks & more with the official magazine for the International Association of Drilling Contractors...\",\"breadcrumb\":{\"@id\":\"https:\/\/drillingcontractor.org\/dc-archive\/may-june-2021#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/drillingcontractor.org\/dc-archive\/may-june-2021\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/drillingcontractor.org\/dc-archive\/may-june-2021#primaryimage\",\"url\":\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2021\/04\/DR-Hero-MJ21-email.png\",\"contentUrl\":\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2021\/04\/DR-Hero-MJ21-email.png\",\"width\":1240,\"height\":660},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/drillingcontractor.org\/dc-archive\/may-june-2021#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/drillingcontractor.org\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"DC Archive\",\"item\":\"https:\/\/drillingcontractor.org\/dc-archive\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"May\/June 2021\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/drillingcontractor.org\/#website\",\"url\":\"https:\/\/drillingcontractor.org\/\",\"name\":\"Drilling Contractor\",\"description\":\"Get the latest oil drilling news with DrillingContractor.org\",\"publisher\":{\"@id\":\"https:\/\/drillingcontractor.org\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/drillingcontractor.org\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/drillingcontractor.org\/#organization\",\"name\":\"Drilling Contractor Magazine\",\"url\":\"https:\/\/drillingcontractor.org\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/drillingcontractor.org\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2015\/04\/logo-login2.jpg\",\"contentUrl\":\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2015\/04\/logo-login2.jpg\",\"width\":200,\"height\":68,\"caption\":\"Drilling Contractor Magazine\"},\"image\":{\"@id\":\"https:\/\/drillingcontractor.org\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"http:\/\/www.facebook.com\/pages\/Drilling-Contractor-Magazine\/112140675010\",\"https:\/\/x.com\/DC_Magazine\",\"https:\/\/www.linkedin.com\/grp\/home?gid=1810343\",\"https:\/\/www.youtube.com\/channel\/UC0xXkxpL1WTf99-oLW8Z9hg\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"May\/June 2021 - Drilling Contractor","description":"Get oil and gas drilling news, videos, ebooks & more with the official magazine for the International Association of Drilling Contractors...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/drillingcontractor.org\/dc-archive\/may-june-2021","og_locale":"en_US","og_type":"article","og_title":"May\/June 2021 - Drilling Contractor","og_description":"Get oil and gas drilling news, videos, ebooks & more with the official magazine for the International Association of Drilling Contractors...","og_url":"https:\/\/drillingcontractor.org\/dc-archive\/may-june-2021","og_site_name":"Drilling Contractor","article_publisher":"http:\/\/www.facebook.com\/pages\/Drilling-Contractor-Magazine\/112140675010","article_modified_time":"2021-05-06T13:38:15+00:00","og_image":[{"url":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2021\/04\/DR-Hero-MJ21-email.png","type":"","width":"","height":""}],"twitter_card":"summary_large_image","twitter_site":"@DC_Magazine","twitter_misc":{"Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/drillingcontractor.org\/dc-archive\/may-june-2021","url":"https:\/\/drillingcontractor.org\/dc-archive\/may-june-2021","name":"May\/June 2021 - Drilling Contractor","isPartOf":{"@id":"https:\/\/drillingcontractor.org\/#website"},"primaryImageOfPage":{"@id":"https:\/\/drillingcontractor.org\/dc-archive\/may-june-2021#primaryimage"},"image":{"@id":"https:\/\/drillingcontractor.org\/dc-archive\/may-june-2021#primaryimage"},"thumbnailUrl":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2021\/04\/DR-Hero-MJ21-email.png","datePublished":"2021-04-27T16:17:51+00:00","dateModified":"2021-05-06T13:38:15+00:00","description":"Get oil and gas drilling news, videos, ebooks & more with the official magazine for the International Association of Drilling Contractors...","breadcrumb":{"@id":"https:\/\/drillingcontractor.org\/dc-archive\/may-june-2021#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/drillingcontractor.org\/dc-archive\/may-june-2021"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/drillingcontractor.org\/dc-archive\/may-june-2021#primaryimage","url":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2021\/04\/DR-Hero-MJ21-email.png","contentUrl":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2021\/04\/DR-Hero-MJ21-email.png","width":1240,"height":660},{"@type":"BreadcrumbList","@id":"https:\/\/drillingcontractor.org\/dc-archive\/may-june-2021#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/drillingcontractor.org\/"},{"@type":"ListItem","position":2,"name":"DC Archive","item":"https:\/\/drillingcontractor.org\/dc-archive"},{"@type":"ListItem","position":3,"name":"May\/June 2021"}]},{"@type":"WebSite","@id":"https:\/\/drillingcontractor.org\/#website","url":"https:\/\/drillingcontractor.org\/","name":"Drilling Contractor","description":"Get the latest oil drilling news with DrillingContractor.org","publisher":{"@id":"https:\/\/drillingcontractor.org\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/drillingcontractor.org\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/drillingcontractor.org\/#organization","name":"Drilling Contractor Magazine","url":"https:\/\/drillingcontractor.org\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/drillingcontractor.org\/#\/schema\/logo\/image\/","url":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2015\/04\/logo-login2.jpg","contentUrl":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2015\/04\/logo-login2.jpg","width":200,"height":68,"caption":"Drilling Contractor Magazine"},"image":{"@id":"https:\/\/drillingcontractor.org\/#\/schema\/logo\/image\/"},"sameAs":["http:\/\/www.facebook.com\/pages\/Drilling-Contractor-Magazine\/112140675010","https:\/\/x.com\/DC_Magazine","https:\/\/www.linkedin.com\/grp\/home?gid=1810343","https:\/\/www.youtube.com\/channel\/UC0xXkxpL1WTf99-oLW8Z9hg"]}]}},"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/pages\/60133","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/comments?post=60133"}],"version-history":[{"count":0,"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/pages\/60133\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/pages\/62"}],"wp:attachment":[{"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/media?parent=60133"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}