{"id":57190,"date":"2020-07-07T15:38:20","date_gmt":"2020-07-07T20:38:20","guid":{"rendered":"https:\/\/drillingcontractor.org\/?page_id=57190"},"modified":"2020-07-15T16:48:02","modified_gmt":"2020-07-15T21:48:02","slug":"july-august-2020","status":"publish","type":"page","link":"https:\/\/drillingcontractor.org\/dc-archive\/july-august-2020","title":{"rendered":"July\/August 2020"},"content":{"rendered":"<div class=\"whtTbl\">\n<table>\n<tbody>\n<tr>\n<th align=\"left\">Looking for the Digital Reader version of this issue? <a href=\"https:\/\/drillingcontractor.org\/digital-reader-julyaug-2020-57235\">Click here!<\/a><\/th>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/digital-reader-julyaug-2020-57235\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2020\/07\/DR-Hero-JA20.png\" alt=\"Digital Reader edition\" width=\"300\" height=\"158\" align=\"right\"><\/a><em>DC<\/em>&#8216;s Digital Reader is a faithful recreation of the printed magazine, in digital form! Digital Reader can be viewed on an iPad or Android tablet, and\/or your Windows or Mac OSX computer.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<div class=\"whtTbl\">\n<table>\n<tbody>\n<tr>\n<th>Special coverage: COVID-19<\/th>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=57009\"> <strong>Pressures amp up as rig counts keep falling<br \/>\n<em>Amid low prices and a vast oil oversupply, drilling industry may need to look to strategic partnerships and diversification for survival<\/em><\/strong><\/a><br \/>\n<em> By Stephen Whitfield, Associate Editor<\/em><\/td>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=57024\"> <strong>Crew health, availability prioritized as companies strive to ensure proper incident response readiness <\/strong><\/a><br \/>\n<em> By Stephen Whitfield, Associate Editor<\/em><\/td>\n<\/tr>\n<tr>\n<th>Digital Transformation<\/th>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=57007\"> <strong>Digital twins drive remote monitoring, integrity management<br \/>\n<em>Virtual models of physical assets are not new, but industry is finding new ways to leverage them on rigs and in the wellbores they drill <\/em><\/strong><\/a><br \/>\n<em> By Stephen Whitfield, Associate Editor<\/em><\/td>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=57028\"> <strong>Unlocking the power of machine learning<br \/>\n<em>Predictive algorithms and natural language processing are fast becoming valuable tools fueling improvements for operators and drilling contractors in remote BOP monitoring, human decision making, safety<\/em><\/strong><\/a><br \/>\n<em> By Stephen Whitfield, Associate Editor<\/em><\/td>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=57036\"> <strong>The future of drilling automation: transforming a vision into reality<\/strong><\/a><br \/>\n<em> By Matthew Jackson, Moumien Ali and Vinesh Rambally, NOV Rig Technologies; Sukanya Romyanon, Kyle Sneed and Panu Boonwattanopas, Chevron<\/em><\/td>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=57170\"> <strong>Closed-loop drilling optimization system: implementation and field results from large-scale deployment <\/strong><\/a><br \/>\n<em> By Stephen Lai, Lars Olesen, James Ng, Aaron Eddy, Sergey Khromov, Dan Paslawski and Ryan van Beurden, Pason Systems; Gregory S. Payette, Benjamin J. Spivey, ExxonMobil Upstream Research Company<br \/>\n<\/em><\/td>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=57026\"> <strong>Industry 4.0: Oil &amp; gas could benefit from outward search for innovations <\/strong><\/a><br \/>\n<em> By John Barratt, Oil &amp; Gas Innovation Center <\/em><\/td>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=57030\"> <strong>Automated steering system aims to improve directional drilling across multiple US onshore basins <\/strong><\/a><br \/>\n<em> By Stephen Whitfield, Associate Editor <\/em><\/td>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=56998\"> <strong>Blockchain may pave the way for easier, more transparent execution of performance-based contracts <\/strong><\/a><br \/>\n<em> By Andrew Bruce, Data Gumbo<\/em><\/td>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=57017\"> <strong>Drilling fluid digital twins developed to monitor rheological properties, cuttings transport functionality <\/strong><\/a><br \/>\n<em> By Stephen Whitfield, Associate Editor <\/em><\/td>\n<\/tr>\n<tr>\n<th>Environmental, Social and Governance<\/th>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=57020\"> <strong>The 7 sins of ESG management <\/strong><\/a><br \/>\n<em> By Kosmas Papadopoulos and Rodolfo Araujo, FTI Consulting<\/em><\/td>\n<\/tr>\n<tr>\n<th>Unlocking Deepwater Efficiencies<\/th>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=57044\"> <strong>SIMOPS, dual-activity rig enable best-in-class well offshore Nigeria <\/strong><\/a><br \/>\n<em> By Jessica Whiteside, Contributor <\/em><\/td>\n<\/tr>\n<tr>\n<th>Drilling Fluids<\/th>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=57032\"> <strong>Risk-based approach, novel fluid solution enable narrow-margin drilling in deepwater Australia <\/strong><\/a><br \/>\n<em> By Gordon Holmes and Paul Baker, Newpark Fluids Systems <\/em><\/td>\n<\/tr>\n<tr>\n<th>IADC Connection<\/th>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=57013\"><strong>From the Chair: Just as drillers have survived tough times in years past, we will be resilient this time <\/strong><\/a><br \/>\n<em> By Julie Robertson, 2020 IADC Chair<\/em><\/td>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=57034\"><strong>News Cuttings<\/strong><\/a><\/p>\n<ul>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=57034#nc1\"><strong>DEC holds &lsquo;Rig for the Future&rsquo; forum, now planning &lsquo;Transformation in Leadership&rsquo;<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=57034#nc2\"><strong>IADC&rsquo;s Martin Flojgaard discusses pandemic challenges in Australia<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=57034#nc3\"><strong>IADC WellSharp Live supports essential training during COVID-19<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=57034#nc4\"><strong>DC hosts virtual event on offshore safety<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=57034#nc5\"><strong>IADC award to recognize field-based personnel<\/strong><\/a><\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=57046\"><strong>Wirelines<\/strong><\/a><\/p>\n<ul>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=57046#w1\"><strong>IADC urges international authorities to adopt IMO pandemic recommendations<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=57046#w2\"><strong>US House Committee on Natural Resources considers program for plugging abandoned oil and gas wells<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=57046#w3\"><strong>Norway&rsquo;s Petroleum Safety Authority releases 2019 annual report<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=57046#w4\"><strong>International organizations urge action to address crew change issues during COVID-19<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=57046#w5\"><strong>OSHA issues revised enforcement policies related to COVID-19 employee protections<\/strong><\/a><\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<th>Departments<\/th>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=57011\"><strong>Drilling Ahead: In crisis, operators must lead to protect their supply chain<\/strong><\/a><br \/>\n<em>By Linda Hsieh, Editor &amp; Publisher<\/em><\/td>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=57002\"><strong> D&amp;C News<\/strong><\/a><\/p>\n<ul>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=57002#DCN1\"><strong> Operators to jointly develop multiple licenses in Krafla, Fulla, North of Alvheim<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=57002#DCN2\"><strong> New gas discovery on Bashrush prospect in Egypt<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=57002#DCN3\"><strong> CNOOC: QINHUANGDAO 33-1s Phase 1 now producing<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=57002#DCN4\"><strong> Nigeria announces 2020 marginal field bid round<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=57002#DCN5\"><strong> Neptune makes discovery in Dugong exploration well<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=57002#DCN6\"><strong> 2 wells drilled for Newpek in Mexico&rsquo;s Trevino field<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=57002#DCN7\"><strong> 3 new wells sanctioned for Manora Project <\/strong><\/a><\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=57004\"><strong>D&amp;C Tech Digest<\/strong><\/a><\/p>\n<ul>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=57004#DCTD1\"><strong>Dual-activity rig enables dual-drilling operation in Norway<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=57004#DCTD2\"><strong>Blockchain consortium completes Bakken pilot<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=57004#DCTD3\"><strong>DNV GL, ABB to collaborate on digitalization roadmap<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=57004#DCTD4\"><strong>Remotely operated survey operations completed offshore Suriname for Apache<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=57004#DCTD5\"><strong>Coating prepares rig for harsh-environment work<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=57004#DCTD6\"><strong>Cut-and-recover operation saves rig time for Wintershall<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=57004#DCTD7\"><strong>COVID-19 sparks rise in demand for remote rig inspections<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=57004#DCTD8\"><strong>2020 OTC Spotlight on New Technology Awards highlight industry innovations<\/strong><\/a><\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=57015\"><strong>News Briefs: Environmental, Social and Governance<\/strong><\/a><\/p>\n<ul>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=57015#esg1\"><strong>Total sets ambitions for net-zero emissions by 2050<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=57015#esg2\"><strong>Major operators to invest in transport, storage of CO<sub>2<\/sub><\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=57015#esg3\"><strong>Scottish Government sets up energy transition fund<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=57015#esg4\"><strong>Texas RRC considers plans to reduce flaring<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=57015#esg5\"><strong>Maersk Drilling joins new CO<sub>2<\/sub> storage consortium <\/strong><\/a><\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=57022\"><strong>HSE&amp;T Corner: Communication, trust cited as key factors for HSE performance during pandemic<\/strong><\/a><br \/>\n<em>By Jay Stracke, Editorial Coordinator<\/em><\/td>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=56956\"><strong>People, Companies and Products<\/strong><\/a><\/p>\n<ul>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=56956#ppl1\"><strong>Noble executes previously announced leadership transition<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=56956#ppl2\"><strong>Forum energy appoints Chinese partner to grow ROV sales<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=56956#ppl3\"><strong>Schlumberger, CNPC logging join forces in China<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=56956#ppl4\"><strong>Neptune Energy announces management changes<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=56956#ppl5\"><strong>Precision recognized with innovation award<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=56956#ppl6\"><strong>Sparrows relocates to support African growth<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=56956#ppl7\"><strong>Chesapeake files for Chapter 11 to eliminate debt<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=56956#ppl8\"><strong>Danos names Reed Per&eacute; as VP Permian Operations<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=56956#ppl9\"><strong>Aker BP set to deploy Optime&rsquo;s ROCS technology<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=56956#ppl10\"><strong>WFS, Subsea Energy Solutions to collaborate<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=56956#ppl11\"><strong>Apergy and ChampionX complete merger<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=56956#ppl12\"><strong>Shell awards 5-year contract for asset visualization software<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=56956#ppl13\"><strong>Exceed establishes subsidiary focused on new commercial models<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=56956#ppl14\"><strong>Trendsetter wins Gulf of Mexico contract for subsea closure device<\/strong><\/a><\/li>\n<\/ul>\n<p><em> Products<\/em><\/p>\n<ul>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=56956#prods1\"><strong>CP2E controller enables connectivity for compact machines<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=56956#prods2\"><strong>Ace Splice Clamp protects control lines during completion<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=56956#prods3\"><strong>Offline cementing solution introduced to reduce NPT<\/strong><\/a><\/li>\n<li><a href=\"https:\/\/drillingcontractor.org\/?p=56956#prods4\"><strong>COVID-19 resilience audit launched for offshore<\/strong><\/a><\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/drillingcontractor.org\/?p=57040\"><strong>Perspectives: Andrew Barry, Wild Well &ndash; Multigenerational roots in oil &amp; gas laid foundation for career spanning design\/testing, marketing, training<\/strong><\/a><br \/>\n<em> By Jay Stracke, Editorial Coordinator<\/em><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Looking for the Digital Reader version of this issue? Click here! DC&#8216;s Digital Reader is a faithful recreation of the printed magazine, in digital form! Digital Reader can be viewed on an iPad or Android tablet, and\/or your Windows or Mac OSX computer. Special coverage: COVID-19 Pressures amp up as rig counts keep falling Amid &hellip;<\/p>\n","protected":false},"author":1,"featured_media":57216,"parent":62,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-57190","page","type-page","status-publish","has-post-thumbnail","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.1.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>July\/Aug 2020 Digital Reader | Drilling Contractor Magazine<\/title>\n<meta name=\"description\" content=\"The July\/August issue of our Digital Reader is now enhanced. Fully Interactive. Clickable videos, audio, &amp; website links available inside. Download it today!\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/drillingcontractor.org\/dc-archive\/july-august-2020\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Digital Reader \u2013 July\/Aug 2020 | Drilling Contractor Magazine\" \/>\n<meta property=\"og:description\" content=\"The July\/August issue of our Digital Reader is now enhanced. Fully Interactive. Clickable videos, audio, &amp; website links available inside. Download it today!\" \/>\n<meta property=\"og:url\" content=\"https:\/\/drillingcontractor.org\/dc-archive\/july-august-2020\" \/>\n<meta property=\"og:site_name\" content=\"Drilling Contractor\" \/>\n<meta property=\"article:publisher\" content=\"http:\/\/www.facebook.com\/pages\/Drilling-Contractor-Magazine\/112140675010\" \/>\n<meta property=\"article:modified_time\" content=\"2020-07-15T21:48:02+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2020\/07\/DR-Hero-JA20.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1240\" \/>\n\t<meta property=\"og:image:height\" content=\"660\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@DC_Magazine\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/drillingcontractor.org\/dc-archive\/july-august-2020\",\"url\":\"https:\/\/drillingcontractor.org\/dc-archive\/july-august-2020\",\"name\":\"July\/Aug 2020 Digital Reader | Drilling Contractor Magazine\",\"isPartOf\":{\"@id\":\"https:\/\/drillingcontractor.org\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/drillingcontractor.org\/dc-archive\/july-august-2020#primaryimage\"},\"image\":{\"@id\":\"https:\/\/drillingcontractor.org\/dc-archive\/july-august-2020#primaryimage\"},\"thumbnailUrl\":\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2020\/07\/img-featured-20.png\",\"datePublished\":\"2020-07-07T20:38:20+00:00\",\"dateModified\":\"2020-07-15T21:48:02+00:00\",\"description\":\"The July\/August issue of our Digital Reader is now enhanced. Fully Interactive. Clickable videos, audio, & website links available inside. Download it today!\",\"breadcrumb\":{\"@id\":\"https:\/\/drillingcontractor.org\/dc-archive\/july-august-2020#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/drillingcontractor.org\/dc-archive\/july-august-2020\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/drillingcontractor.org\/dc-archive\/july-august-2020#primaryimage\",\"url\":\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2020\/07\/img-featured-20.png\",\"contentUrl\":\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2020\/07\/img-featured-20.png\",\"width\":620,\"height\":330},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/drillingcontractor.org\/dc-archive\/july-august-2020#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/drillingcontractor.org\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"DC Archive\",\"item\":\"https:\/\/drillingcontractor.org\/dc-archive\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"July\/August 2020\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/drillingcontractor.org\/#website\",\"url\":\"https:\/\/drillingcontractor.org\/\",\"name\":\"Drilling Contractor\",\"description\":\"Get the latest oil drilling news with DrillingContractor.org\",\"publisher\":{\"@id\":\"https:\/\/drillingcontractor.org\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/drillingcontractor.org\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/drillingcontractor.org\/#organization\",\"name\":\"Drilling Contractor Magazine\",\"url\":\"https:\/\/drillingcontractor.org\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/drillingcontractor.org\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2015\/04\/logo-login2.jpg\",\"contentUrl\":\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2015\/04\/logo-login2.jpg\",\"width\":200,\"height\":68,\"caption\":\"Drilling Contractor Magazine\"},\"image\":{\"@id\":\"https:\/\/drillingcontractor.org\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"http:\/\/www.facebook.com\/pages\/Drilling-Contractor-Magazine\/112140675010\",\"https:\/\/x.com\/DC_Magazine\",\"https:\/\/www.linkedin.com\/grp\/home?gid=1810343\",\"https:\/\/www.youtube.com\/channel\/UC0xXkxpL1WTf99-oLW8Z9hg\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"July\/Aug 2020 Digital Reader | Drilling Contractor Magazine","description":"The July\/August issue of our Digital Reader is now enhanced. Fully Interactive. Clickable videos, audio, & website links available inside. Download it today!","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/drillingcontractor.org\/dc-archive\/july-august-2020","og_locale":"en_US","og_type":"article","og_title":"Digital Reader \u2013 July\/Aug 2020 | Drilling Contractor Magazine","og_description":"The July\/August issue of our Digital Reader is now enhanced. Fully Interactive. Clickable videos, audio, & website links available inside. Download it today!","og_url":"https:\/\/drillingcontractor.org\/dc-archive\/july-august-2020","og_site_name":"Drilling Contractor","article_publisher":"http:\/\/www.facebook.com\/pages\/Drilling-Contractor-Magazine\/112140675010","article_modified_time":"2020-07-15T21:48:02+00:00","og_image":[{"width":1240,"height":660,"url":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2020\/07\/DR-Hero-JA20.png","type":"image\/png"}],"twitter_card":"summary_large_image","twitter_site":"@DC_Magazine","twitter_misc":{"Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/drillingcontractor.org\/dc-archive\/july-august-2020","url":"https:\/\/drillingcontractor.org\/dc-archive\/july-august-2020","name":"July\/Aug 2020 Digital Reader | Drilling Contractor Magazine","isPartOf":{"@id":"https:\/\/drillingcontractor.org\/#website"},"primaryImageOfPage":{"@id":"https:\/\/drillingcontractor.org\/dc-archive\/july-august-2020#primaryimage"},"image":{"@id":"https:\/\/drillingcontractor.org\/dc-archive\/july-august-2020#primaryimage"},"thumbnailUrl":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2020\/07\/img-featured-20.png","datePublished":"2020-07-07T20:38:20+00:00","dateModified":"2020-07-15T21:48:02+00:00","description":"The July\/August issue of our Digital Reader is now enhanced. Fully Interactive. Clickable videos, audio, & website links available inside. Download it today!","breadcrumb":{"@id":"https:\/\/drillingcontractor.org\/dc-archive\/july-august-2020#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/drillingcontractor.org\/dc-archive\/july-august-2020"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/drillingcontractor.org\/dc-archive\/july-august-2020#primaryimage","url":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2020\/07\/img-featured-20.png","contentUrl":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2020\/07\/img-featured-20.png","width":620,"height":330},{"@type":"BreadcrumbList","@id":"https:\/\/drillingcontractor.org\/dc-archive\/july-august-2020#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/drillingcontractor.org\/"},{"@type":"ListItem","position":2,"name":"DC Archive","item":"https:\/\/drillingcontractor.org\/dc-archive"},{"@type":"ListItem","position":3,"name":"July\/August 2020"}]},{"@type":"WebSite","@id":"https:\/\/drillingcontractor.org\/#website","url":"https:\/\/drillingcontractor.org\/","name":"Drilling Contractor","description":"Get the latest oil drilling news with DrillingContractor.org","publisher":{"@id":"https:\/\/drillingcontractor.org\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/drillingcontractor.org\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/drillingcontractor.org\/#organization","name":"Drilling Contractor Magazine","url":"https:\/\/drillingcontractor.org\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/drillingcontractor.org\/#\/schema\/logo\/image\/","url":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2015\/04\/logo-login2.jpg","contentUrl":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2015\/04\/logo-login2.jpg","width":200,"height":68,"caption":"Drilling Contractor Magazine"},"image":{"@id":"https:\/\/drillingcontractor.org\/#\/schema\/logo\/image\/"},"sameAs":["http:\/\/www.facebook.com\/pages\/Drilling-Contractor-Magazine\/112140675010","https:\/\/x.com\/DC_Magazine","https:\/\/www.linkedin.com\/grp\/home?gid=1810343","https:\/\/www.youtube.com\/channel\/UC0xXkxpL1WTf99-oLW8Z9hg"]}]}},"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/pages\/57190","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/comments?post=57190"}],"version-history":[{"count":0,"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/pages\/57190\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/pages\/62"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/media\/57216"}],"wp:attachment":[{"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/media?parent=57190"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}