{"id":55898,"date":"2020-03-30T13:19:59","date_gmt":"2020-03-30T18:19:59","guid":{"rendered":"https:\/\/drillingcontractor.org\/?p=55898"},"modified":"2020-03-30T13:23:39","modified_gmt":"2020-03-30T18:23:39","slug":"equinor-anticipates-faster-ramp-up-higher-plateau-at-johan-sverdrup","status":"publish","type":"post","link":"https:\/\/drillingcontractor.org\/equinor-anticipates-faster-ramp-up-higher-plateau-at-johan-sverdrup-55898","title":{"rendered":"Equinor anticipates faster ramp-up, higher plateau at Johan Sverdrup"},"content":{"rendered":"<p>Johan Sverdrup is expected to reach plateau production its first phase in early May, earlier than its anticipated summer peak date.<\/p>\n<p><strong>Equinor<\/strong>, the operator of the massive North Sea offshore development, said that daily production has already exceeded 430,000 bbl\/d of oil. Due to higher plant capacity, plateau production will increase from around 440,000 bbl\/d of oil to around 470,000 bbl\/d.<\/p>\n<p>&ldquo;Field production has been very good and stable from day one, and the wells have produced even better than expected,&rdquo; <strong>Rene Nedregaard<\/strong>, Vice President for Johan Sverdrup Operations at Equinor, said in a statement. &ldquo;We are currently completing the tenth well. This work is progressing smoothly, helping reach higher production earlier than expected. We also expect to increase plant capacity.&rdquo;<\/p>\n<p>Johan Sverdrup came on stream last October. Phase 2 of the project, which is scheduled to begin in late 2022, will produce 690,000 bbl\/d of oil at its plateau. Expected recoverable reserves in the field are 2.7 billion boe, and Equinor said its ambition is to recover more than 70% of those reserves.<\/p>\n<p>&ldquo;We are working systematically with our partners to increase value creation from the field and ensure an optimal recovery factor,&rdquo; Nedregaard said.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The massive North Sea offshore development is expected to reach plateau production in early May, ahead of its previously anticipated summer date. Equinor said that it will increase the plateau by 30,000 bbl\/D of oil due to higher plant capacity. <\/p>\n","protected":false},"author":27,"featured_media":55899,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[13,12,53],"tags":[],"class_list":["post-55898","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mkt","category-news","category-os"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.1.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Equinor anticipates faster ramp-up, higher plateau at Johan Sverdrup - Drilling Contractor<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/drillingcontractor.org\/equinor-anticipates-faster-ramp-up-higher-plateau-at-johan-sverdrup-55898\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Equinor anticipates faster ramp-up, higher plateau at Johan Sverdrup - Drilling Contractor\" \/>\n<meta property=\"og:description\" content=\"The massive North Sea offshore development is expected to reach plateau production in early May, ahead of its previously anticipated summer date. Equinor said that it will increase the plateau by 30,000 bbl\/D of oil due to higher plant capacity.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/drillingcontractor.org\/equinor-anticipates-faster-ramp-up-higher-plateau-at-johan-sverdrup-55898\" \/>\n<meta property=\"og:site_name\" content=\"Drilling Contractor\" \/>\n<meta property=\"article:publisher\" content=\"http:\/\/www.facebook.com\/pages\/Drilling-Contractor-Magazine\/112140675010\" \/>\n<meta property=\"article:published_time\" content=\"2020-03-30T18:19:59+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-03-30T18:23:39+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2020\/03\/Equinor-Johan-Sverdrup.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"620\" \/>\n\t<meta property=\"og:image:height\" content=\"330\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Stephen Whitfield\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@DC_Magazine\" \/>\n<meta name=\"twitter:site\" content=\"@DC_Magazine\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Stephen Whitfield\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/drillingcontractor.org\/equinor-anticipates-faster-ramp-up-higher-plateau-at-johan-sverdrup-55898#article\",\"isPartOf\":{\"@id\":\"https:\/\/drillingcontractor.org\/equinor-anticipates-faster-ramp-up-higher-plateau-at-johan-sverdrup-55898\"},\"author\":{\"name\":\"Stephen Whitfield\",\"@id\":\"https:\/\/drillingcontractor.org\/#\/schema\/person\/6ad0ea5045fabf60b3f541782e889f6f\"},\"headline\":\"Equinor anticipates faster ramp-up, higher plateau at Johan Sverdrup\",\"datePublished\":\"2020-03-30T18:19:59+00:00\",\"dateModified\":\"2020-03-30T18:23:39+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/drillingcontractor.org\/equinor-anticipates-faster-ramp-up-higher-plateau-at-johan-sverdrup-55898\"},\"wordCount\":201,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/drillingcontractor.org\/#organization\"},\"image\":{\"@id\":\"https:\/\/drillingcontractor.org\/equinor-anticipates-faster-ramp-up-higher-plateau-at-johan-sverdrup-55898#primaryimage\"},\"thumbnailUrl\":\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2020\/03\/Equinor-Johan-Sverdrup.jpg\",\"articleSection\":[\"Global and Regional Markets\",\"News\",\"The Offshore Frontier\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/drillingcontractor.org\/equinor-anticipates-faster-ramp-up-higher-plateau-at-johan-sverdrup-55898#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/drillingcontractor.org\/equinor-anticipates-faster-ramp-up-higher-plateau-at-johan-sverdrup-55898\",\"url\":\"https:\/\/drillingcontractor.org\/equinor-anticipates-faster-ramp-up-higher-plateau-at-johan-sverdrup-55898\",\"name\":\"Equinor anticipates faster ramp-up, higher plateau at Johan Sverdrup - Drilling Contractor\",\"isPartOf\":{\"@id\":\"https:\/\/drillingcontractor.org\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/drillingcontractor.org\/equinor-anticipates-faster-ramp-up-higher-plateau-at-johan-sverdrup-55898#primaryimage\"},\"image\":{\"@id\":\"https:\/\/drillingcontractor.org\/equinor-anticipates-faster-ramp-up-higher-plateau-at-johan-sverdrup-55898#primaryimage\"},\"thumbnailUrl\":\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2020\/03\/Equinor-Johan-Sverdrup.jpg\",\"datePublished\":\"2020-03-30T18:19:59+00:00\",\"dateModified\":\"2020-03-30T18:23:39+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/drillingcontractor.org\/equinor-anticipates-faster-ramp-up-higher-plateau-at-johan-sverdrup-55898#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/drillingcontractor.org\/equinor-anticipates-faster-ramp-up-higher-plateau-at-johan-sverdrup-55898\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/drillingcontractor.org\/equinor-anticipates-faster-ramp-up-higher-plateau-at-johan-sverdrup-55898#primaryimage\",\"url\":\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2020\/03\/Equinor-Johan-Sverdrup.jpg\",\"contentUrl\":\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2020\/03\/Equinor-Johan-Sverdrup.jpg\",\"width\":620,\"height\":330},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/drillingcontractor.org\/equinor-anticipates-faster-ramp-up-higher-plateau-at-johan-sverdrup-55898#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/drillingcontractor.org\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Equinor anticipates faster ramp-up, higher plateau at Johan Sverdrup\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/drillingcontractor.org\/#website\",\"url\":\"https:\/\/drillingcontractor.org\/\",\"name\":\"Drilling Contractor\",\"description\":\"Get the latest oil drilling news with DrillingContractor.org\",\"publisher\":{\"@id\":\"https:\/\/drillingcontractor.org\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/drillingcontractor.org\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/drillingcontractor.org\/#organization\",\"name\":\"Drilling Contractor Magazine\",\"url\":\"https:\/\/drillingcontractor.org\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/drillingcontractor.org\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2015\/04\/logo-login2.jpg\",\"contentUrl\":\"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2015\/04\/logo-login2.jpg\",\"width\":200,\"height\":68,\"caption\":\"Drilling Contractor Magazine\"},\"image\":{\"@id\":\"https:\/\/drillingcontractor.org\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"http:\/\/www.facebook.com\/pages\/Drilling-Contractor-Magazine\/112140675010\",\"https:\/\/x.com\/DC_Magazine\",\"https:\/\/www.linkedin.com\/grp\/home?gid=1810343\",\"https:\/\/www.youtube.com\/channel\/UC0xXkxpL1WTf99-oLW8Z9hg\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/drillingcontractor.org\/#\/schema\/person\/6ad0ea5045fabf60b3f541782e889f6f\",\"name\":\"Stephen Whitfield\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/drillingcontractor.org\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/92c47992ea757d8ec15a0e0b7728854d8698a806d3070a1730707716fb9e8b33?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/92c47992ea757d8ec15a0e0b7728854d8698a806d3070a1730707716fb9e8b33?s=96&d=mm&r=g\",\"caption\":\"Stephen Whitfield\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Equinor anticipates faster ramp-up, higher plateau at Johan Sverdrup - Drilling Contractor","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/drillingcontractor.org\/equinor-anticipates-faster-ramp-up-higher-plateau-at-johan-sverdrup-55898","og_locale":"en_US","og_type":"article","og_title":"Equinor anticipates faster ramp-up, higher plateau at Johan Sverdrup - Drilling Contractor","og_description":"The massive North Sea offshore development is expected to reach plateau production in early May, ahead of its previously anticipated summer date. Equinor said that it will increase the plateau by 30,000 bbl\/D of oil due to higher plant capacity.","og_url":"https:\/\/drillingcontractor.org\/equinor-anticipates-faster-ramp-up-higher-plateau-at-johan-sverdrup-55898","og_site_name":"Drilling Contractor","article_publisher":"http:\/\/www.facebook.com\/pages\/Drilling-Contractor-Magazine\/112140675010","article_published_time":"2020-03-30T18:19:59+00:00","article_modified_time":"2020-03-30T18:23:39+00:00","og_image":[{"width":620,"height":330,"url":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2020\/03\/Equinor-Johan-Sverdrup.jpg","type":"image\/jpeg"}],"author":"Stephen Whitfield","twitter_card":"summary_large_image","twitter_creator":"@DC_Magazine","twitter_site":"@DC_Magazine","twitter_misc":{"Written by":"Stephen Whitfield","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/drillingcontractor.org\/equinor-anticipates-faster-ramp-up-higher-plateau-at-johan-sverdrup-55898#article","isPartOf":{"@id":"https:\/\/drillingcontractor.org\/equinor-anticipates-faster-ramp-up-higher-plateau-at-johan-sverdrup-55898"},"author":{"name":"Stephen Whitfield","@id":"https:\/\/drillingcontractor.org\/#\/schema\/person\/6ad0ea5045fabf60b3f541782e889f6f"},"headline":"Equinor anticipates faster ramp-up, higher plateau at Johan Sverdrup","datePublished":"2020-03-30T18:19:59+00:00","dateModified":"2020-03-30T18:23:39+00:00","mainEntityOfPage":{"@id":"https:\/\/drillingcontractor.org\/equinor-anticipates-faster-ramp-up-higher-plateau-at-johan-sverdrup-55898"},"wordCount":201,"commentCount":0,"publisher":{"@id":"https:\/\/drillingcontractor.org\/#organization"},"image":{"@id":"https:\/\/drillingcontractor.org\/equinor-anticipates-faster-ramp-up-higher-plateau-at-johan-sverdrup-55898#primaryimage"},"thumbnailUrl":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2020\/03\/Equinor-Johan-Sverdrup.jpg","articleSection":["Global and Regional Markets","News","The Offshore Frontier"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/drillingcontractor.org\/equinor-anticipates-faster-ramp-up-higher-plateau-at-johan-sverdrup-55898#respond"]}]},{"@type":"WebPage","@id":"https:\/\/drillingcontractor.org\/equinor-anticipates-faster-ramp-up-higher-plateau-at-johan-sverdrup-55898","url":"https:\/\/drillingcontractor.org\/equinor-anticipates-faster-ramp-up-higher-plateau-at-johan-sverdrup-55898","name":"Equinor anticipates faster ramp-up, higher plateau at Johan Sverdrup - Drilling Contractor","isPartOf":{"@id":"https:\/\/drillingcontractor.org\/#website"},"primaryImageOfPage":{"@id":"https:\/\/drillingcontractor.org\/equinor-anticipates-faster-ramp-up-higher-plateau-at-johan-sverdrup-55898#primaryimage"},"image":{"@id":"https:\/\/drillingcontractor.org\/equinor-anticipates-faster-ramp-up-higher-plateau-at-johan-sverdrup-55898#primaryimage"},"thumbnailUrl":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2020\/03\/Equinor-Johan-Sverdrup.jpg","datePublished":"2020-03-30T18:19:59+00:00","dateModified":"2020-03-30T18:23:39+00:00","breadcrumb":{"@id":"https:\/\/drillingcontractor.org\/equinor-anticipates-faster-ramp-up-higher-plateau-at-johan-sverdrup-55898#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/drillingcontractor.org\/equinor-anticipates-faster-ramp-up-higher-plateau-at-johan-sverdrup-55898"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/drillingcontractor.org\/equinor-anticipates-faster-ramp-up-higher-plateau-at-johan-sverdrup-55898#primaryimage","url":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2020\/03\/Equinor-Johan-Sverdrup.jpg","contentUrl":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2020\/03\/Equinor-Johan-Sverdrup.jpg","width":620,"height":330},{"@type":"BreadcrumbList","@id":"https:\/\/drillingcontractor.org\/equinor-anticipates-faster-ramp-up-higher-plateau-at-johan-sverdrup-55898#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/drillingcontractor.org\/"},{"@type":"ListItem","position":2,"name":"Equinor anticipates faster ramp-up, higher plateau at Johan Sverdrup"}]},{"@type":"WebSite","@id":"https:\/\/drillingcontractor.org\/#website","url":"https:\/\/drillingcontractor.org\/","name":"Drilling Contractor","description":"Get the latest oil drilling news with DrillingContractor.org","publisher":{"@id":"https:\/\/drillingcontractor.org\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/drillingcontractor.org\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/drillingcontractor.org\/#organization","name":"Drilling Contractor Magazine","url":"https:\/\/drillingcontractor.org\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/drillingcontractor.org\/#\/schema\/logo\/image\/","url":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2015\/04\/logo-login2.jpg","contentUrl":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2015\/04\/logo-login2.jpg","width":200,"height":68,"caption":"Drilling Contractor Magazine"},"image":{"@id":"https:\/\/drillingcontractor.org\/#\/schema\/logo\/image\/"},"sameAs":["http:\/\/www.facebook.com\/pages\/Drilling-Contractor-Magazine\/112140675010","https:\/\/x.com\/DC_Magazine","https:\/\/www.linkedin.com\/grp\/home?gid=1810343","https:\/\/www.youtube.com\/channel\/UC0xXkxpL1WTf99-oLW8Z9hg"]},{"@type":"Person","@id":"https:\/\/drillingcontractor.org\/#\/schema\/person\/6ad0ea5045fabf60b3f541782e889f6f","name":"Stephen Whitfield","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/drillingcontractor.org\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/92c47992ea757d8ec15a0e0b7728854d8698a806d3070a1730707716fb9e8b33?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/92c47992ea757d8ec15a0e0b7728854d8698a806d3070a1730707716fb9e8b33?s=96&d=mm&r=g","caption":"Stephen Whitfield"}}]}},"jetpack_featured_media_url":"https:\/\/drillingcontractor.org\/wp-content\/uploads\/2020\/03\/Equinor-Johan-Sverdrup.jpg","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/posts\/55898","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/users\/27"}],"replies":[{"embeddable":true,"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/comments?post=55898"}],"version-history":[{"count":0,"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/posts\/55898\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/media\/55899"}],"wp:attachment":[{"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/media?parent=55898"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/categories?post=55898"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/drillingcontractor.org\/wp-json\/wp\/v2\/tags?post=55898"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}